Housekeeping.
Musgrave Pit · 410511830 CFR 56.20003(a) · $151.00 proposed penalty
Barricades and warning signs.
Musgrave Pit · 410511830 CFR 56.20011 · $151.00 proposed penalty
Machinery
Banrich Quarry · 4105489No dys awy frm wrk,no rstr act
Accident narrative
The EE was performing services on the AC condenser of a 770 Caterpillar haul truck. The EE right hand slipped during repair and came into contact with the condenser fan causing a laceration to their right pinky finger that required stitches.
Regular Safety and Health Inspection
Banrich Quarry · 410548915.3 on-site hours reported
Combustible waste.
Banrich Quarry · 410548930 CFR 56.4104(a) · $267.00 proposed penalty
Housekeeping.
Banrich Quarry · 410548930 CFR 56.20003(a) · $267.00 proposed penalty
Safe access.
Banrich Quarry · 410548930 CFR 56.11001 · $267.00 proposed penalty
Construction and maintenance of guards.
Banrich Quarry · 410548930 CFR 56.14112(b) · $398.00 proposed penalty
Regular Safety and Health Inspection
Imperial Rock Mine · 08012484.0 on-site hours reported
Regular Safety and Health Inspection
A-Mining Group II LLC. · 08011344.5 on-site hours reported
Moving machine parts.
A-Mining Group II LLC. · 080113430 CFR 56.14107(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Tejas Quarry · 410523230 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Tejas Quarry · 410523230 CFR 50.30(a) · $151.00 proposed penalty
Requirement for container labels.
Tejas Quarry · 410523230 CFR 47.41(a) · $165.00 proposed penalty
New task training.
Tejas Quarry · 410523230 CFR 46.7(a) · Significant and substantial (S&S) · $909.00 proposed penalty
Regular Safety and Health Inspection
Imperial Rock Mine · 08012482.0 on-site hours reported
General requirements.
Tejas Quarry · 410523230 CFR 56.4200(b)(1) · $245.00 proposed penalty
Safety defects; examination, correction and records.
Tejas Quarry · 410523230 CFR 56.14100(b) · $818.00 proposed penalty
Regular Safety and Health Inspection
Tejas Quarry · 410523223.5 on-site hours reported
Housekeeping.
Tejas Quarry · 410523230 CFR 56.20003(a) · $245.00 proposed penalty
Housekeeping.
Tejas Quarry · 410523230 CFR 56.20003(a) · $245.00 proposed penalty
Berms or guardrails.
Tejas Quarry · 410523230 CFR 56.9300(b) · $245.00 proposed penalty
Electrical conductors.
Heath Quarry · 090113930 CFR 56.12004 · $549.00 proposed penalty
Unguarded conveyors with adjacent travelways.
Heath Quarry · 090113930 CFR 56.14109(b) · $193.00 proposed penalty
Regular Safety and Health Inspection
Heath Quarry · 090113921.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.