Jose A Trujano; Raul Garcia; Reynaldo S Garcia safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
The Bandit Pit · 41057056.3 on-site hours reported
Safety defects; examination, correction and records.
The Bandit Pit · 410570530 CFR 56.14100(b) · $151.00 proposed penalty
Compliance Follow-up Inspection
The Bandit Pit · 41057050.0 on-site hours reported
Regular Safety and Health Inspection
The Bandit Pit · 41057057.3 on-site hours reported
Testing grounding systems.
The Bandit Pit · 410570530 CFR 56.12028 · $883.00 proposed penalty
Examination of working places.
The Bandit Pit · 410570530 CFR 56.18002(b) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
The Bandit Pit · 410570530 CFR 50.30(a) · $151.00 proposed penalty
Training plans.
The Bandit Pit · 410570530 CFR 46.3(a) · $151.00 proposed penalty
New miner training.
The Bandit Pit · 410570530 CFR 46.5(a) · Significant and substantial (S&S) · $233.00 proposed penalty
Insulation and fittings for power wires and cables.
The Bandit Pit · 410570530 CFR 56.12008 · $267.00 proposed penalty
Berms or guardrails.
The Bandit Pit · 410570530 CFR 56.9300(a) · $755.00 proposed penalty
Regular Safety and Health Inspection
The Bandit Pit · 410570511.0 on-site hours reported
Compliance Follow-up Inspection
The Bandit Pit · 41057052.3 on-site hours reported
Examination of working places.
The Bandit Pit · 410570530 CFR 56.18002(a) · $226.00 proposed penalty
Safety defects; examination, correction and records.
The Bandit Pit · 410570530 CFR 56.14100(c) · Significant and substantial (S&S) · $4,152.00 proposed penalty
Regular Safety and Health Inspection
The Bandit Pit · 410570512.5 on-site hours reported
Safety defects; examination, correction and records.
The Bandit Pit · 410570530 CFR 56.14100(a) · $755.00 proposed penalty
Safety defects; examination, correction and records.
The Bandit Pit · 410570530 CFR 56.14100(b) · $755.00 proposed penalty
Brakes.
The Bandit Pit · 410570530 CFR 56.14101(a)(2) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Horns and backup alarms.
The Bandit Pit · 410570530 CFR 56.14132(b)(1)(i) · $755.00 proposed penalty
Guarding electrical connections and resistor grids.
The Bandit Pit · 410570530 CFR 56.12023 · $226.00 proposed penalty
Horns and backup alarms.
The Bandit Pit · 410570530 CFR 56.14132(b)(1)(i) · $226.00 proposed penalty
Electric substations and liquid storage facilities.
The Bandit Pit · 410570530 CFR 56.4130(b) · $226.00 proposed penalty
Combustible waste.
The Bandit Pit · 410570530 CFR 56.4104(a) · $226.00 proposed penalty
Horns and backup alarms.
The Bandit Pit · 410570530 CFR 56.14132(a) · $226.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.