John W Rich safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Storage of materials.
St. Nicholas Cogeneration Plant · 360797930 CFR 77.208(e) · $151.00 proposed penalty
Travelways at surface installations.
St. Nicholas Cogeneration Plant · 360797930 CFR 77.205(b) · Significant and substantial (S&S) · $151.00 proposed penalty
Regular Safety and Health Inspection
St. Nicholas Cogeneration Plant · 360797935.0 on-site hours reported
Machinery
St. Nicholas Cogeneration Plant · 3607979No dys awy frm wrk,no rstr act
Accident narrative
When using a chain hoist to rig a conveyor belt, employee got hand caught between chain hoist and motor. Resulting in a finger laceration to the left pinky.
Quantity and location of firefighting equipment.
Mahanoy City Stripping · 361021030 CFR 77.1109(a) · $151.00 proposed penalty
Changes; notification by operator.
Mahanoy City Stripping · 361021030 CFR 41.12 · $151.00 proposed penalty
Regular Safety and Health Inspection
Mahanoy City Stripping · 361021028.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.