John T Quintrell safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Clamping of trailing cables to equipment.
#9A · 151911630 CFR 75.605 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
#9A · 151911630 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Spot Inspections
#9A · 1519116103(i) · 2.0 on-site hours reported
Spot Inspection
CV#25 Auger Miner · 15193221.0 on-site hours reported
Spot Inspection
CV#37 Auger Miner · 44070851.0 on-site hours reported
Regular Safety and Health Inspection
Scarlet Refuse Recovery · 46096681.0 on-site hours reported
Accumulation of combustible materials.
#9A · 151911630 CFR 75.400 · $151.00 proposed penalty
Maintenance of diesel-powered equipment.
#9A · 151911630 CFR 75.1914(a) · Significant and substantial (S&S) · $398.00 proposed penalty
Regular Safety and Health Inspection
#9A · 1519116163.0 on-site hours reported
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
#9A · 151911630 CFR 75.1714-3(b) · $151.00 proposed penalty
Accumulation of combustible materials.
#9A · 151911630 CFR 75.400 · $151.00 proposed penalty
Roof control plan.
#9A · 151911630 CFR 75.220(a)(1) · $151.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
#9A · 151911630 CFR 75.1101-10 · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
#9A · 151911630 CFR 75.380(d)(4) · $151.00 proposed penalty
Spot Inspection
#9A · 151911627.5 on-site hours reported
Spot Inspections
#9A · 1519116103(i) · 6.0 on-site hours reported
Permissible electric face equipment; maintenance.
#9A · 151911630 CFR 75.503 · $151.00 proposed penalty
Automatic emergency-parking brakes.
#9A · 151911630 CFR 75.523-3(b)(1) · Significant and substantial (S&S) · $398.00 proposed penalty
Loading and haulage equipment; installations.
#9A · 151911630 CFR 77.1605(d) · $193.00 proposed penalty
Spot Inspections
#9A · 1519116103(i) · 6.0 on-site hours reported
Methane monitors.
#9A · 151911630 CFR 75.342(a)(4) · Significant and substantial (S&S) · $398.00 proposed penalty
Regular Safety and Health Inspection
Sapphire Prep Plant · 15129147.5 on-site hours reported
Spot Inspections
#9A · 1519116103(i) · 3.8 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
#9A · 151911630 CFR 50.30(a) · $151.00 proposed penalty
Installation of main mine fans.
#9A · 151911630 CFR 75.310(a)(4) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.