John Mitch Potter safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulations of combustible materials.
Delbarton Preparation Plant · 460564930 CFR 77.1104 · $3,263.00 proposed penalty
Accumulations of combustible materials.
Delbarton Preparation Plant · 460564930 CFR 77.1104 · Significant and substantial (S&S) · $4,871.00 proposed penalty
Insulating mats at power switches.
RAGLAND LOADOUT · 460856330 CFR 77.513 · $151.00 proposed penalty
Protective clothing; requirements.
RAGLAND LOADOUT · 460856330 CFR 77.1710(h) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Holden #22 Surface · 460898430 CFR 77.1605(a) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Holden #22 Surface · 460898430 CFR 77.1605(d) · $697.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Holden #22 Surface · 460898430 CFR 77.1606(c) · $959.00 proposed penalty
Drilling; general.
Holden #22 Surface · 460898430 CFR 77.1007(b) · $165.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
DEEPWATER SURFACE MINE · 460910530 CFR 77.1606(c) · $336.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Lower War Eagle · 460931930 CFR 75.1731(a) · $151.00 proposed penalty
Spot Inspections
Lower War Eagle · 4609319103(i) · 7.5 on-site hours reported
Travelways at surface installations.
Delbarton Preparation Plant · 460564930 CFR 77.205(e) · $313.00 proposed penalty
Surface installations; general.
Delbarton Preparation Plant · 460564930 CFR 77.200 · $1,550.00 proposed penalty
Cable fittings; suitability.
Delbarton Preparation Plant · 460564930 CFR 77.505 · $313.00 proposed penalty
Mechanical equipment guards.
Delbarton Preparation Plant · 460564930 CFR 77.400(a) · $209.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Delbarton Preparation Plant · 460564930 CFR 77.1606(c) · $336.00 proposed penalty
Storage of materials.
Delbarton Preparation Plant · 460564930 CFR 77.208(d) · $313.00 proposed penalty
Examination and maintenance of firefighting equipment.
RAGLAND LOADOUT · 460856330 CFR 77.1110 · $151.00 proposed penalty
Illumination.
RAGLAND LOADOUT · 460856330 CFR 77.207
Methane monitors.
Lower War Eagle · 460931930 CFR 75.342(a)(4) · $151.00 proposed penalty
Methane monitors.
Lower War Eagle · 460931930 CFR 75.342(a)(4) · $151.00 proposed penalty
Regular Safety and Health Inspection
Eagle Energy Mine No.1 · 460942554.3 on-site hours reported
Travelways at surface installations.
Delbarton Preparation Plant · 460564930 CFR 77.205(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Illumination.
Delbarton Preparation Plant · 460564930 CFR 77.207 · $313.00 proposed penalty
Regular Safety and Health Inspection
Delbarton Preparation Plant · 4605649133.3 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.