← John Mitch Potter

John Mitch Potter safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulations of combustible materials.

    violationRecord 5131117
    Delbarton Preparation Plant · 4605649

    30 CFR 77.1104 · $3,263.00 proposed penalty

  2. Accumulations of combustible materials.

    violationRecord 5131116
    Delbarton Preparation Plant · 4605649

    30 CFR 77.1104 · Significant and substantial (S&S) · $4,871.00 proposed penalty

  3. Insulating mats at power switches.

    violationRecord 5092105
    RAGLAND LOADOUT · 4608563

    30 CFR 77.513 · $151.00 proposed penalty

  4. Protective clothing; requirements.

    violationRecord 5092104
    RAGLAND LOADOUT · 4608563

    30 CFR 77.1710(h) · $151.00 proposed penalty

  5. Loading and haulage equipment; installations.

    violationRecord 5091444
    Holden #22 Surface · 4608984

    30 CFR 77.1605(a) · $151.00 proposed penalty

  6. Loading and haulage equipment; installations.

    violationRecord 5091443
    Holden #22 Surface · 4608984

    30 CFR 77.1605(d) · $697.00 proposed penalty

  7. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5091442
    Holden #22 Surface · 4608984

    30 CFR 77.1606(c) · $959.00 proposed penalty

  8. Drilling; general.

    violationRecord 5091441
    Holden #22 Surface · 4608984

    30 CFR 77.1007(b) · $165.00 proposed penalty

  9. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5025526
    DEEPWATER SURFACE MINE · 4609105

    30 CFR 77.1606(c) · $336.00 proposed penalty

  10. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5091328
    Lower War Eagle · 4609319

    30 CFR 75.1731(a) · $151.00 proposed penalty

  11. Spot Inspections

    inspectionRecord F009E04
    Lower War Eagle · 4609319

    103(i) · 7.5 on-site hours reported

  12. Travelways at surface installations.

    violationRecord 5131115
    Delbarton Preparation Plant · 4605649

    30 CFR 77.205(e) · $313.00 proposed penalty

  13. Surface installations; general.

    violationRecord 5131114
    Delbarton Preparation Plant · 4605649

    30 CFR 77.200 · $1,550.00 proposed penalty

  14. Cable fittings; suitability.

    violationRecord 5131113
    Delbarton Preparation Plant · 4605649

    30 CFR 77.505 · $313.00 proposed penalty

  15. Mechanical equipment guards.

    violationRecord 5131112
    Delbarton Preparation Plant · 4605649

    30 CFR 77.400(a) · $209.00 proposed penalty

  16. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5131111
    Delbarton Preparation Plant · 4605649

    30 CFR 77.1606(c) · $336.00 proposed penalty

  17. Storage of materials.

    violationRecord 5131110
    Delbarton Preparation Plant · 4605649

    30 CFR 77.208(d) · $313.00 proposed penalty

  18. Examination and maintenance of firefighting equipment.

    violationRecord 5092103
    RAGLAND LOADOUT · 4608563

    30 CFR 77.1110 · $151.00 proposed penalty

  19. Illumination.

    violationRecord 5092102
    RAGLAND LOADOUT · 4608563

    30 CFR 77.207

  20. Methane monitors.

    violationRecord 5090333
    Lower War Eagle · 4609319

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  21. Methane monitors.

    violationRecord 5090332
    Lower War Eagle · 4609319

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  22. Regular Safety and Health Inspection

    inspectionRecord 6321986
    Eagle Energy Mine No.1 · 4609425

    54.3 on-site hours reported

  23. Travelways at surface installations.

    violationRecord 5131109
    Delbarton Preparation Plant · 4605649

    30 CFR 77.205(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  24. Illumination.

    violationRecord 5131108
    Delbarton Preparation Plant · 4605649

    30 CFR 77.207 · $313.00 proposed penalty

  25. Regular Safety and Health Inspection

    inspectionRecord F02EC67
    Delbarton Preparation Plant · 4605649

    133.3 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.