John Mitch Potter safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Vehicles used to transport explosives.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.1302(j) · $465.00 proposed penalty
Health Technical Investigation
Powellton #1 Mine · 46092178.5 on-site hours reported
Spot Inspections
Lower War Eagle · 4609319103(i) · 4.5 on-site hours reported
Hoisting of materials.
Holden #22 Surface · 460898430 CFR 77.210(a) · $1,818.00 proposed penalty
Machinery and equipment; operation and maintenance.
Holden #22 Surface · 460898430 CFR 77.404(a) · $3,184.00 proposed penalty
Automatic fire sensor and warning device systems; examination and test requirements.
Lower War Eagle · 460931930 CFR 75.1103-8(c) · $151.00 proposed penalty
Communications facilities; refuge alternatives.
Lower War Eagle · 460931930 CFR 75.1600-3(a)(2) · $151.00 proposed penalty
Regular Safety and Health Inspection
TWIN BRANCH NO 1 SURFACE · 4609075307.3 on-site hours reported
Roof control plan-approval criteria.
Lower War Eagle · 460931930 CFR 75.222(b)(1) · $151.00 proposed penalty
Roof bolting.
Lower War Eagle · 460931930 CFR 75.204(c)(1) · $1,219.00 proposed penalty
Surface installations; general.
Delbarton Preparation Plant · 460564930 CFR 77.200 · $818.00 proposed penalty
Travelways at surface installations.
Delbarton Preparation Plant · 460564930 CFR 77.205(b) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Surface installations; general.
Delbarton Preparation Plant · 460564930 CFR 77.200 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Accumulations of combustible materials.
Delbarton Preparation Plant · 460564930 CFR 77.1104
Accumulations of combustible materials.
Delbarton Preparation Plant · 460564930 CFR 77.1104
Loading and haulage equipment; inspection and maintenance.
Holden #22 Surface · 460898430 CFR 77.1606(c) · $432.00 proposed penalty
Loading and haulage equipment; installations.
Holden #22 Surface · 460898430 CFR 77.1605(a) · $151.00 proposed penalty
Accumulations of combustible materials.
Holden #22 Surface · 460898430 CFR 77.1104 · $193.00 proposed penalty
Loading and haulage equipment; installations.
Holden #22 Surface · 460898430 CFR 77.1605(d) · $209.00 proposed penalty
Accumulations of combustible materials.
Holden #22 Surface · 460898430 CFR 77.1104 · $193.00 proposed penalty
Loading and haulage equipment; installations.
Holden #22 Surface · 460898430 CFR 77.1605(d) · $465.00 proposed penalty
Requirement for container labels.
Holden #22 Surface · 460898430 CFR 47.41(a) · $245.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Lower War Eagle · 460931930 CFR 75.1731(b) · $267.00 proposed penalty
Loading and haulage equipment; installations.
Middle Fork Surface · 460964530 CFR 77.1605(d) · $151.00 proposed penalty
Regular Safety and Health Inspection
Middle Fork Surface · 460964522.3 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.