John Mitch Potter safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
Lower War Eagle · 460931930 CFR 75.1600-2(e) · $151.00 proposed penalty
Roof bolting.
Lower War Eagle · 460931930 CFR 75.204(c)(1) · $245.00 proposed penalty
Handtools (nonpowered)
Eagle Energy Mine No.1 · 4609425No dys awy frm wrk,no rstr act
Accident narrative
Employee stated EE was helping to strip the red phase lead in the High Line preparing to enter the High Line into the #3 Outby KVA. As EE was stripping the lead EE's knife blade slipped causing a laceration to EE's left thumb. Employee sought medical treatment and received 5 stitches.
Electric equipment; examination, testing and maintenance.
Lower War Eagle · 460931930 CFR 75.512 · $151.00 proposed penalty
Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.
Lower War Eagle · 460931930 CFR 75.1107-1(a)(3)(ii) · $209.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
Lower War Eagle · 460931930 CFR 75.701 · $209.00 proposed penalty
Automatic fire warning devices; actions and response.
Powellton #1 Mine · 460921730 CFR 75.1103-5(h) · $151.00 proposed penalty
Accumulation of combustible materials.
Lower War Eagle · 460931930 CFR 75.400 · $432.00 proposed penalty
Permissible electric face equipment; maintenance.
Lower War Eagle · 460931930 CFR 75.503 · $313.00 proposed penalty
Impoundment Spot Inspection
Delbarton Preparation Plant · 46056493.3 on-site hours reported
Escapeways; bituminous and lignite mines.
Powellton #1 Mine · 460921730 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty
Roof bolting.
Lower War Eagle · 460931930 CFR 75.204(c)(1) · $245.00 proposed penalty
Protection from falls of roof, face and ribs.
Lower War Eagle · 460931930 CFR 75.202(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Other safeguards.
Lower War Eagle · 460931930 CFR 75.1403 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Accumulation of combustible materials.
Lower War Eagle · 460931930 CFR 75.400 · $432.00 proposed penalty
Permissible electric face equipment; maintenance.
Lower War Eagle · 460931930 CFR 75.503 · $313.00 proposed penalty
Deenergization of self-propelled electric face equipment; performance requirements.
Lower War Eagle · 460931930 CFR 75.523-2(a)(2) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Automatic emergency-parking brakes.
Lower War Eagle · 460931930 CFR 75.523-3(c)(2) · $313.00 proposed penalty
Roof bolting.
Lower War Eagle · 460931930 CFR 75.204(c)(1) · $245.00 proposed penalty
Inspection of fire suppression devices.
Lower War Eagle · 460931930 CFR 75.1107-16(b) · $245.00 proposed penalty
Roof control plan.
Lower War Eagle · 460931930 CFR 75.220(a)(1) · $288.00 proposed penalty
Other safeguards.
Lower War Eagle · 460931930 CFR 75.1403 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Powered haulage
TWIN BRANCH NO 1 SURFACE · 4609075Days away from work only
Accident narrative
Employee was driving to the Coal pit and hit something in the road, EE was jarred and said EE's back and leg was hurting. Went to EE's Dr. and was given days off to rest.
Spot Inspections
Lower War Eagle · 4609319103(i) · 8.0 on-site hours reported
Machinery and equipment; operation and maintenance.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.404(a) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.