John Mitch Potter safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Methane monitors.
Powellton #1 Mine · 460921730 CFR 75.342(a)(4) · $151.00 proposed penalty
Loading and haulage equipment; operation.
Peach Orchard Prep Plant & Loading Facil · 460837630 CFR 77.1607(i) · $151.00 proposed penalty
Loading and haulage equipment; operation.
Peach Orchard Prep Plant & Loading Facil · 460837630 CFR 77.1607(i) · $151.00 proposed penalty
Slip or fall of person
TWIN BRANCH NO 1 SURFACE · 4609075Days away from work only
Accident narrative
After climbing up on to the track of a Dozer, the employee was attempting to latch the drop-down handrail when the handle broke and they lost balance and fell. The employee was taken to clinic, employee has fractured Spinous Process, given medication and rest for a week.
Impoundment Spot Inspection
Delbarton Preparation Plant · 46056492.0 on-site hours reported
Electrical connections or splices; suitability.
Lower War Eagle · 460931930 CFR 75.514 · $209.00 proposed penalty
Automatic fire sensors.
Lower War Eagle · 460931930 CFR 75.1103-1 · $151.00 proposed penalty
Accumulation of combustible materials.
Lower War Eagle · 460931930 CFR 75.400 · $177.00 proposed penalty
Spot Inspections
Lower War Eagle · 4609319103(i) · 5.8 on-site hours reported
Spot Inspection
SHM-45 · 46096464.5 on-site hours reported
Temporary notations, revisions, and supplements.
Lower War Eagle · 460931930 CFR 75.1202-1(b)(3) · $209.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
Lower War Eagle · 460931930 CFR 75.601-1 · $151.00 proposed penalty
Roof bolting.
Lower War Eagle · 460931930 CFR 75.204(c)(1) · $209.00 proposed penalty
Roof control plan.
Lower War Eagle · 460931930 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Status change reports.
SHM-45 · 460964630 CFR 71.209(a) · $151.00 proposed penalty
Spot Inspections
LITTLE EAGLE MINE NO 1 · 4608560103(i) · 8.0 on-site hours reported
Machinery and equipment; operation and maintenance.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.404(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.502 · $465.00 proposed penalty
Warning signs; smoking and open flame.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.1102 · $313.00 proposed penalty
Examination and maintenance of firefighting equipment.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.1110 · $549.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.1606(c) · $1,219.00 proposed penalty
Machinery and equipment; operation and maintenance.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.404(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Accumulations of combustible materials.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.1104 · $1,037.00 proposed penalty
Loading and haulage equipment; installations.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.1605(l) · $313.00 proposed penalty
Power wires and cables; insulation and protection.
Lower War Eagle · 460931930 CFR 75.517 · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.