John Mitch Potter safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Roof control plan.
Road Fork Deep Mine · 460964830 CFR 75.220(a)(1)
Powered haulage
Eagle Energy Mine No.1 · 4609425No dys awy frm wrk,no rstr act
Accident narrative
Employee was riding to the section on a rubber tire mantrip when EE struck EE's head on the bottom of the overcast. Stated EE was not paying attention. Caused a laceration to EE's left forehead. Employee was seen at Montgomery General Hospital where EE received 5 stitches and was released back to work.
Spot Inspection
Deep Water Prep Plant P-2 · 46091628.0 on-site hours reported
Health Technical Investigation
Lower War Eagle · 460931911.0 on-site hours reported
Surface installations; general.
Holden No 22 Preparation Plant · 460590930 CFR 77.200
Travelways at surface installations.
Holden No 22 Preparation Plant · 460590930 CFR 77.205(b)
Mechanical equipment guards.
Holden No 22 Preparation Plant · 460590930 CFR 77.400(d)
Illumination.
Holden No 22 Preparation Plant · 460590930 CFR 77.207
Openings in surface installations; safeguards.
Holden No 22 Preparation Plant · 460590930 CFR 77.204
Mobile equipment; automatic warning devices.
Deep Water Prep Plant P-2 · 460916230 CFR 77.410(c)
Roof control plan.
Road Fork Deep Mine · 460964830 CFR 75.220(a)(1)
Machinery and equipment; operation and maintenance.
Road Fork Deep Mine · 460964830 CFR 75.1725(a) · Significant and substantial (S&S)
Spot Inspections
Lower War Eagle · 4609319103(i) · 6.0 on-site hours reported
Power wires; support.
Lower War Eagle · 460931930 CFR 75.516
Electric equipment; examination, testing and maintenance.
Road Fork Deep Mine · 460964830 CFR 75.512
Protection from falls of roof, face and ribs.
Road Fork Deep Mine · 460964830 CFR 75.202(a) · Significant and substantial (S&S)
Protection from falls of roof, face and ribs.
Road Fork Deep Mine · 460964830 CFR 75.202(a) · Significant and substantial (S&S)
Machinery
Deep Water Prep Plant P-2 · 4609162Days away from work only
Accident narrative
Employee was in the process of greasing an excavator bucket. When EE stepped back to allow operator to extend bucket to access grease fittings the bucket suddenly shifted sideways and hit the employee knocking EE to the ground. The hit from the bucket broke employee's ribs and when EE fell EE inadvertently hit EE's head on the bucket causing laceration to the top of EE's head.
Regular Safety and Health Inspection
Eagle Energy Mine No.1 · 46094258.0 on-site hours reported
Travelways at surface installations.
Delbarton Preparation Plant · 460564930 CFR 77.205(b)
Surface installations; general.
Delbarton Preparation Plant · 460564930 CFR 77.200
Travelways at surface installations.
Holden No 22 Preparation Plant · 460590930 CFR 77.205(b)
Surface installations; general.
Holden No 22 Preparation Plant · 460590930 CFR 77.200
Accumulations of combustible materials.
Holden No 22 Preparation Plant · 460590930 CFR 77.1104
Travelways at surface installations.
Holden No 22 Preparation Plant · 460590930 CFR 77.205(b)
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.