John Mitch Potter safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Health Technical Investigation
TWIN BRANCH NO 1 SURFACE · 46090755.0 on-site hours reported
Health Technical Investigation
TWIN BRANCH NO 1 SURFACE · 46090755.0 on-site hours reported
Spot Inspection
Lower War Eagle · 46093195.3 on-site hours reported
Machinery, equipment, and tools.
Cherokee Rock Quarry · 400352930 CFR 56.14205 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Inspection and cover plates.
Cherokee Rock Quarry · 400352930 CFR 56.12032 · $151.00 proposed penalty
Protection of gas cylinder valves.
Cherokee Rock Quarry · 400352930 CFR 56.16006 · $151.00 proposed penalty
Machinery, equipment, and tools.
Cherokee Rock Quarry · 400352930 CFR 56.14205 · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Cherokee Rock Quarry · 400352930 CFR 50.30(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Cherokee Rock Quarry · 400352930 CFR 56.14100(c) · Significant and substantial (S&S) · $366.00 proposed penalty
Verbal Hazard Complaint Inspections
DEEPWATER SURFACE MINE · 46091052.5 on-site hours reported
Verbal Hazard Complaint Inspections
Deep Water Prep Plant P-2 · 46091622.5 on-site hours reported
Spot Inspections
Lower War Eagle · 4609319103(i) · 4.3 on-site hours reported
Loading and haulage equipment; operation.
DEEPWATER SURFACE MINE · 460910530 CFR 77.1607(b) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
DEEPWATER SURFACE MINE · 460910530 CFR 77.1606(a) · $151.00 proposed penalty
Roof control plan.
Lower War Eagle · 460931930 CFR 75.220(a)(1) · $151.00 proposed penalty
Other
LITTLE EAGLE MINE NO 1 · 4608560Days away from work only
Accident narrative
Employee was walking up entry and felt a pain and burning in left knee , EE advised pain increased with any movement , also advised there was no mechanism of injury. Employee was brought to surface and transported to medical facility for treatment
Travelways at surface installations.
Deep Water Prep Plant P-2 · 460916230 CFR 77.205(a) · $151.00 proposed penalty
Illumination.
Deep Water Prep Plant P-2 · 460916230 CFR 77.207 · $151.00 proposed penalty
Travelways at surface installations.
Holden No 22 Preparation Plant · 460590930 CFR 77.205(a) · Significant and substantial (S&S) · $366.00 proposed penalty
Travelways at surface installations.
Holden No 22 Preparation Plant · 460590930 CFR 77.205(b) · Significant and substantial (S&S) · $165.00 proposed penalty
Dust accumulations in surface installations.
Holden No 22 Preparation Plant · 460590930 CFR 77.202 · Significant and substantial (S&S) · $366.00 proposed penalty
Highwalls, pits and spoil banks; plans.
DEEPWATER SURFACE MINE · 460910530 CFR 77.1000 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Mine ventilation plan; submission and approval.
LITTLE EAGLE MINE NO 1 · 460856030 CFR 75.370(a)(1) · $151.00 proposed penalty
Automatic fire warning devices; actions and response.
LITTLE EAGLE MINE NO 1 · 460856030 CFR 75.1103-5(a)(1) · $336.00 proposed penalty
Regular Safety and Health Inspection
Glenco Load-Out · 460921819.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.