John Mitch Potter safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Machinery and equipment; operation and maintenance.

    violationRecord 5183739
    Eagle Energy Mine No.1 · 4609425

    30 CFR 75.1725(a) · $165.00 proposed penalty

  2. Emergency tethers.

    violationRecord 5183738
    Eagle Energy Mine No.1 · 4609425

    30 CFR 75.1714-6 · $151.00 proposed penalty

  3. Spot Inspections

    inspectionRecord F005E8A
    Lower War Eagle · 4609319

    103(i) · 5.5 on-site hours reported

  4. Escapeways; bituminous and lignite mines.

    violationRecord 5183737
    Eagle Energy Mine No.1 · 4609425

    30 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty

  5. Drill dust control at underground areas of underground mines.

    violationRecord 5183736
    Eagle Energy Mine No.1 · 4609425

    30 CFR 72.630(b) · $151.00 proposed penalty

  6. Regular Safety and Health Inspection

    inspectionRecord F00ACDF
    Eagle Energy Mine No.1 · 4609425

    82.8 on-site hours reported

  7. Permissible electric face equipment; maintenance.

    violationRecord 5183524
    LITTLE EAGLE MINE NO 1 · 4608560

    30 CFR 75.503 · $151.00 proposed penalty

  8. Permissible electric face equipment; maintenance.

    violationRecord 5183523
    LITTLE EAGLE MINE NO 1 · 4608560

    30 CFR 75.503 · $151.00 proposed penalty

  9. Regular Safety and Health Inspection

    inspectionRecord F016EE6
    LITTLE EAGLE MINE NO 1 · 4608560

    113.5 on-site hours reported

  10. Regular Safety and Health Inspection

    inspectionRecord F005EB1
    Powellton #1 Mine · 4609217

    61.8 on-site hours reported

  11. Regular Safety and Health Inspection

    inspectionRecord F005EB2
    Lower War Eagle · 4609319

    63.0 on-site hours reported

  12. Machinery and equipment; operation and maintenance.

    violationRecord 5180175
    Deep Water Prep Plant P-2 · 4609162

    30 CFR 77.404(a) · Significant and substantial (S&S) · $245.00 proposed penalty

  13. Loading and haulage equipment; installations.

    violationRecord 5180174
    Deep Water Prep Plant P-2 · 4609162

    30 CFR 77.1605(d) · $151.00 proposed penalty

  14. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5180173
    Deep Water Prep Plant P-2 · 4609162

    30 CFR 77.1606(c) · Significant and substantial (S&S) · $245.00 proposed penalty

  15. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5180172
    Deep Water Prep Plant P-2 · 4609162

    30 CFR 50.30(a) · $151.00 proposed penalty

  16. Travelways at surface installations.

    violationRecord 5180171
    Deep Water Prep Plant P-2 · 4609162

    30 CFR 77.205(e) · Significant and substantial (S&S) · $151.00 proposed penalty

  17. Machinery and equipment; operation and maintenance.

    violationRecord 5180170
    Deep Water Prep Plant P-2 · 4609162

    30 CFR 77.404(a) · Significant and substantial (S&S) · $366.00 proposed penalty

  18. Loading and haulage equipment; installations.

    violationRecord 5180169
    Deep Water Prep Plant P-2 · 4609162

    30 CFR 77.1605(d) · $151.00 proposed penalty

  19. Spot Inspections

    inspectionRecord 7047944
    Lower War Eagle · 4609319

    103(i) · 6.3 on-site hours reported

  20. Mobile equipment; automatic warning devices.

    violationRecord 5028589
    DEEPWATER SURFACE MINE · 4609105

    30 CFR 77.410(a)(1) · $151.00 proposed penalty

  21. Inspection and cover plates.

    violationRecord 5088002
    Cherokee Rock Quarry · 4003529

    30 CFR 56.12032 · $245.00 proposed penalty

  22. Machinery, equipment, and tools.

    violationRecord 5088001
    Cherokee Rock Quarry · 4003529

    30 CFR 56.14205 · $245.00 proposed penalty

  23. Warning signs; smoking and open flame.

    violationRecord 5092342
    Holden No 22 Preparation Plant · 4605909

    30 CFR 77.1102 · $151.00 proposed penalty

  24. Independent contractor register.

    violationRecord 5092341
    Holden No 22 Preparation Plant · 4605909

    30 CFR 45.4(b) · $151.00 proposed penalty

  25. Regular Safety and Health Inspection

    inspectionRecord F041D69
    Cherokee Rock Quarry · 4003529

    20.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.