Jerry Skeens; Eddie Skeens safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mine ventilation plan; submission and approval.
Mine No 5 · 151894330 CFR 75.370(a)(1) · $1,037.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Mine No 5 · 151894330 CFR 75.1731(b) · $366.00 proposed penalty
Accumulation of combustible materials.
Mine No 5 · 151894330 CFR 75.400 · $313.00 proposed penalty
Automatic emergency-parking brakes.
Mine No 5 · 151894330 CFR 75.523-3(c)(2) · $151.00 proposed penalty
Deenergization of self-propelled electric face equipment; performance requirements.
Mine No 5 · 151894330 CFR 75.523-2(b) · Significant and substantial (S&S) · $818.00 proposed penalty
Accumulation of combustible materials.
Mine No 5 · 151894330 CFR 75.400 · $313.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mine No 5 · 151894330 CFR 75.512 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Regular Safety and Health Inspection
Mine No 5 · 1518943171.0 on-site hours reported
Verbal Hazard Complaint Inspections
Mine No 5 · 15189437.0 on-site hours reported
Mine ventilation plan; submission and approval.
Mine No 5 · 151894330 CFR 75.370(a)(1) · Significant and substantial (S&S) · $642.00 proposed penalty
Mine ventilation plan; submission and approval.
Mine No 5 · 151894330 CFR 75.370(a)(1) · $151.00 proposed penalty
Accumulation of combustible materials.
Mine No 5 · 151894330 CFR 75.400 · $288.00 proposed penalty
Identification check system.
Mine No 5 · 151894330 CFR 75.1715 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Mine No 5 · 151894330 CFR 75.370(a)(1) · $592.00 proposed penalty
Accumulation of combustible materials.
Mine No 5 · 151894330 CFR 75.400 · $313.00 proposed penalty
Escapeways; bituminous and lignite mines.
Mine No 5 · 151894330 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
Mine No 5 · 151894330 CFR 72.630(b) · Significant and substantial (S&S) · $465.00 proposed penalty
Machinery and equipment; operation and maintenance.
Mine No 5 · 151894330 CFR 75.1725(a) · Significant and substantial (S&S) · $642.00 proposed penalty
Mine ventilation plan; submission and approval.
Mine No 5 · 151894330 CFR 75.370(a)(1) · $366.00 proposed penalty
Protection of trailing cables.
Mine No 5 · 151894330 CFR 75.606 · $151.00 proposed penalty
Condition and examination of firefighting equipment.
Mine No 5 · 151894330 CFR 75.1100-3 · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
Mine No 5 · 151894330 CFR 75.503 · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Mine No 5 · 151894330 CFR 75.1725(a) · Significant and substantial (S&S) · $549.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
Mine No 5 · 151894330 CFR 75.601-1 · $151.00 proposed penalty
Identification of circuit breakers.
Mine No 5 · 151894330 CFR 75.904 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.