James Keith Shearer safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspection
Shearer #1 · 340222214.5 on-site hours reported
Regular Safety and Health Inspection
Shearer #1 · 34022226.8 on-site hours reported
Housekeeping.
Shearer #1 · 340222230 CFR 56.20003(a) · $193.00 proposed penalty
Berms or guardrails.
Shearer #1 · 340222230 CFR 56.9300(a) · $288.00 proposed penalty
Horns and backup alarms.
Shearer #1 · 340222230 CFR 56.14132(a) · $642.00 proposed penalty
Construction and maintenance of guards.
Shearer #1 · 340222230 CFR 56.14112(a)(1) · $288.00 proposed penalty
New miner training.
Shearer #1 · 340222230 CFR 46.5(a) · Significant and substantial (S&S) · $7,872.00 proposed penalty
Electrical conductors.
Shearer #1 · 340222230 CFR 56.12004 · $193.00 proposed penalty
Regular Safety and Health Inspection
Shearer #1 · 340222215.0 on-site hours reported
Moving machine parts.
Shearer #1 · 340222230 CFR 56.14107(a) · $288.00 proposed penalty
Moving machine parts.
Shearer #1 · 340222230 CFR 56.14107(a) · $288.00 proposed penalty
Housekeeping.
Shearer #1 · 340222230 CFR 56.20003(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Housekeeping.
Shearer #1 · 340222230 CFR 56.20003(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Berms or guardrails.
Shearer #1 · 340222230 CFR 56.9300(b) · $193.00 proposed penalty
Compliance Follow-up Inspection
Shearer #1 · 34022221.5 on-site hours reported
Warning signs.
Shearer #1 · 340222230 CFR 56.4101 · $151.00 proposed penalty
Inspection.
Shearer #1 · 340222230 CFR 56.4201(a)(1) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Shearer #1 · 340222230 CFR 50.30(a) · $151.00 proposed penalty
Independent contractor register.
Shearer #1 · 340222230 CFR 45.4(b) · $151.00 proposed penalty
Changes; notification by operator.
Shearer #1 · 340222230 CFR 41.12 · $151.00 proposed penalty
Regular Safety and Health Inspection
Shearer #1 · 340222210.3 on-site hours reported
Identification of power switches.
Shearer #1 · 340222230 CFR 56.12018 · $151.00 proposed penalty
Construction and maintenance of guards.
Shearer #1 · 340222230 CFR 56.14112(b) · $151.00 proposed penalty
Moving machine parts.
Shearer #1 · 340222230 CFR 56.14107(a) · $151.00 proposed penalty
Moving machine parts.
Shearer #1 · 340222230 CFR 56.14107(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.