James C Justice III safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Escapeway maps.
BELCHER BRANCH · 460947430 CFR 75.1505(a) · $165.00 proposed penalty
Protection from falls of roof, face and ribs.
BELCHER BRANCH · 460947430 CFR 75.202(a) · $592.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
BELCHER BRANCH · 460947430 CFR 75.1731(a) · $366.00 proposed penalty
Accumulation of combustible materials.
BELCHER BRANCH · 460947430 CFR 75.400 · $755.00 proposed penalty
Protection from falls of roof, face and ribs.
BELCHER BRANCH · 460947430 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Multi-gas detectors.
BELCHER BRANCH · 460947430 CFR 75.1714-7(a) · $245.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
BELCHER BRANCH · 460947430 CFR 75.1731(a) · $366.00 proposed penalty
Ventilation controls.
BELCHER BRANCH · 460947430 CFR 75.333(d)(3) · $245.00 proposed penalty
Hazard training.
BELCHER BRANCH · 460947430 CFR 48.31(a) · $2,187.00 proposed penalty
Proximity detection systems.
BELCHER BRANCH · 460947430 CFR 75.1732(a)(1) · Significant and substantial (S&S) · $9,004.00 proposed penalty
Ventilation controls.
BELCHER BRANCH · 460947430 CFR 75.333(h) · $883.00 proposed penalty
Machinery and equipment; operation and maintenance.
BELCHER BRANCH · 460947430 CFR 75.1725(a) · Significant and substantial (S&S) · $90,649.00 proposed penalty
Verbal Hazard Complaint Inspections
BELCHER BRANCH · 460947424.5 on-site hours reported
Regular Safety and Health Inspection
BELCHER BRANCH · 4609474215.8 on-site hours reported
Violation — cited standard not reported
BELCHER BRANCH · 4609474$517.00 proposed penalty
Ventilation controls.
BELCHER BRANCH · 460947430 CFR 75.333(d)(1) · $245.00 proposed penalty
Roof control plan.
BELCHER BRANCH · 460947430 CFR 75.220(a)(1) · Significant and substantial (S&S) · $90,649.00 proposed penalty
On-shift examination.
BELCHER BRANCH · 460947430 CFR 75.362(a)(1) · Significant and substantial (S&S) · $14,929.00 proposed penalty
Permissible electric face equipment; maintenance.
BELCHER BRANCH · 460947430 CFR 75.503 · Significant and substantial (S&S) · $20,560.00 proposed penalty
Inspection of fire suppression devices.
BELCHER BRANCH · 460947430 CFR 75.1107-16(c) · $1,968.00 proposed penalty
Inspection of fire suppression devices.
BELCHER BRANCH · 460947430 CFR 75.1107-16(b) · $592.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
BELCHER BRANCH · 460947430 CFR 75.1731(b) · $245.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
BELCHER BRANCH · 460947430 CFR 75.1731(a) · $366.00 proposed penalty
Electric equipment; examination, testing and maintenance.
BELCHER BRANCH · 460947430 CFR 75.512 · Significant and substantial (S&S) · $21,713.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
BELCHER BRANCH · 460947430 CFR 75.701 · $1,818.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.