James C Justice III safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Disorders (physical agents)
Tams No.1 Surface Mine · 4608716Occupatnal illness not deg 1-6
Accident narrative
Employee was found unconscious setting in their Rock Truck.
Non-Fatal Accident Investigation
Tams No.1 Surface Mine · 460871612.3 on-site hours reported
Violation — cited standard not reported
Tams No.1 Surface Mine · 4608716Machinery and equipment; operation and maintenance.
Tams No.1 Surface Mine · 460871630 CFR 77.404(a) · Significant and substantial (S&S) · $7,084.00 proposed penalty
Spot Inspections
BELCHER BRANCH · 4609474103(i) · 4.8 on-site hours reported
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
BELCHER BRANCH · 460947430 CFR 75.1600-2(e) · $245.00 proposed penalty
Short circuit protection of trailing cables.
BELCHER BRANCH · 460947430 CFR 75.601 · $818.00 proposed penalty
Cable fittings; suitability.
BELCHER BRANCH · 460947430 CFR 77.505 · $245.00 proposed penalty
Mine ventilation plan; submission and approval.
BELCHER BRANCH · 460947430 CFR 75.370(a)(1)
Spot Inspections
BELCHER BRANCH · 4609474103(i) · 7.5 on-site hours reported
Status change reports.
BELCHER BRANCH · 460947430 CFR 70.212(a) · $151.00 proposed penalty
Spot Inspections
BELCHER BRANCH · 4609474103(i) · 1.8 on-site hours reported
Escapeway maps.
BELCHER BRANCH · 460947430 CFR 75.1505(b) · $755.00 proposed penalty
Identification of circuit breakers.
BELCHER BRANCH · 460947430 CFR 75.904 · $755.00 proposed penalty
Rock dusting.
BELCHER BRANCH · 460947430 CFR 75.402 · $549.00 proposed penalty
Mine ventilation plan; submission and approval.
BELCHER BRANCH · 460947430 CFR 75.370(a)(1) · $714.00 proposed penalty
Conventional roof support.
BELCHER BRANCH · 460947430 CFR 75.206(e) · $1,818.00 proposed penalty
On-shift examination.
BELCHER BRANCH · 460947430 CFR 75.362(d)(1)(iii) · $818.00 proposed penalty
Roof control plan.
BELCHER BRANCH · 460947430 CFR 75.220(a)(1) · $5,574.00 proposed penalty
Protection from falls of roof, face and ribs.
BELCHER BRANCH · 460947430 CFR 75.202(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty
Mine map.
BELCHER BRANCH · 460947430 CFR 75.1200(b) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
BELCHER BRANCH · 460947430 CFR 75.370(a)(1)
Protection from falls of roof, face and ribs.
BELCHER BRANCH · 460947430 CFR 75.202(a)
Protection from falls of roof, face and ribs.
BELCHER BRANCH · 460947430 CFR 75.202(a) · Significant and substantial (S&S) · $26,139.00 proposed penalty
Machinery and equipment; operation and maintenance.
BELCHER BRANCH · 460947430 CFR 75.1725(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.