Intrepid Potash Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Housekeeping.
Intrepid Potash East · 290017030 CFR 57.20003(a) · $697.00 proposed penalty
Construction and maintenance of guards.
Intrepid Potash East · 290017030 CFR 57.14112(b) · $549.00 proposed penalty
Regular Safety and Health Inspection
Intrepid Potash East · 290017068.0 on-site hours reported
Regular Safety and Health Inspection
Intrepid Potash West · 290017523.0 on-site hours reported
Compliance Follow-up Inspection
Intrepid Potash East · 29001701.0 on-site hours reported
Compliance Follow-up Inspection
Intrepid Potash West · 29001751.5 on-site hours reported
Electrical conductors.
Intrepid Potash East · 290017030 CFR 57.12004 · $209.00 proposed penalty
Warning signs.
Intrepid Potash East · 290017030 CFR 57.4101 · $151.00 proposed penalty
Warning devices for restricted clearances.
Intrepid Potash West · 290017530 CFR 57.9306 · $151.00 proposed penalty
Inspection.
Intrepid Potash West · 290017530 CFR 57.4201(a)(2) · $151.00 proposed penalty
Correction of hazardous conditions.
Intrepid Potash West · 290017530 CFR 57.3200 · $151.00 proposed penalty
Correction of hazardous conditions.
Intrepid Potash West · 290017530 CFR 57.3200 · $151.00 proposed penalty
Moving machine parts.
Intrepid Potash East · 290017030 CFR 57.14107(a) · $151.00 proposed penalty
Protection for openings around travelways.
Intrepid Potash East · 290017030 CFR 57.11012 · $151.00 proposed penalty
Safe access.
Intrepid Potash East · 290017030 CFR 57.11001 · Significant and substantial (S&S) · $504.00 proposed penalty
Construction and maintenance of guards.
Intrepid Potash East · 290017030 CFR 57.14112(b) · $313.00 proposed penalty
Correction of hazardous conditions.
Intrepid Potash East · 290017030 CFR 57.3200 · $151.00 proposed penalty
Inspection.
Intrepid Potash East · 290017030 CFR 57.4201 · $151.00 proposed penalty
Correction of hazardous conditions.
Intrepid Potash East · 290017030 CFR 57.3200 · Significant and substantial (S&S) · $755.00 proposed penalty
Correction of hazardous conditions.
Intrepid Potash East · 290017030 CFR 57.3200 · Significant and substantial (S&S) · $755.00 proposed penalty
Moving machine parts.
Intrepid Potash East · 290017030 CFR 57.14107(a) · $151.00 proposed penalty
Correction of hazardous conditions.
Intrepid Potash East · 290017030 CFR 57.3200 · Significant and substantial (S&S) · $504.00 proposed penalty
Correction of hazardous conditions.
Intrepid Potash East · 290017030 CFR 57.3200 · $151.00 proposed penalty
Grounding circuit enclosures.
Intrepid Potash East · 290017030 CFR 57.12025 · $151.00 proposed penalty
Grounding transformer and switchgear enclosures.
Intrepid Potash East · 290017030 CFR 57.12026 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.