Imerys S A; Norsk Mineral AS safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
K-T Feldspar Plant · 310133455.8 on-site hours reported
Regular Safety and Health Inspection
Wiseman Sullins/Chalk · 310011721.0 on-site hours reported
Machinery
K-T Feldspar Plant · 3101334No dys awy frm wrk,no rstr act
Accident narrative
While picking up at the end of a shift (06/10/2026) the employee felt a scratching in EE's left eye. EE didn't think much of it and went home without reporting it to management. On the morning of 06/11/2026 at 07:00 am it was reported that EE had a foreign object in EE's left eye. TQC safety took EE straight way to App. Eye Center for treatment.
Regular Safety and Health Inspection
Chalk Mountain Mine · 310237410.0 on-site hours reported
Regular Safety and Health Inspection
KT Mica · 31019559.3 on-site hours reported
Emergency telephone numbers.
Pine Mountain Mine · 310237330 CFR 56.18012 · $151.00 proposed penalty
Inspection.
Pine Mountain Mine · 310237330 CFR 56.4201(a)(2) · $151.00 proposed penalty
Examination of working places.
Pine Mountain Mine · 310237330 CFR 56.18002(a)(1) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Pine Mountain Mine · 310237330 CFR 56.14100(c) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Pine Mountain Mine · 310237330 CFR 56.14100(c) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Pine Mountain Mine · 310237330 CFR 56.14100(c) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Pine Mountain Mine · 310237330 CFR 56.14100(c) · $151.00 proposed penalty
General requirements.
Pine Mountain Mine · 310237330 CFR 56.4200(a)(1) · $151.00 proposed penalty
General requirements.
Pine Mountain Mine · 310237330 CFR 56.4200(a)(1) · $151.00 proposed penalty
Parking procedures for unattended equipment.
Pine Mountain Mine · 310237330 CFR 56.14207 · Significant and substantial (S&S) · $465.00 proposed penalty
Berms or guardrails.
Pine Mountain Mine · 310237330 CFR 56.9300(a) · $151.00 proposed penalty
Life jackets and belts.
Pine Mountain Mine · 310237330 CFR 56.15020 · $151.00 proposed penalty
Inspection.
Pine Mountain Mine · 310237330 CFR 56.4201(a)(2) · $151.00 proposed penalty
Parking procedures for unattended equipment.
Pine Mountain Mine · 310237330 CFR 56.14207 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Pine Mountain Mine · 310237330 CFR 56.14100(a) · $151.00 proposed penalty
Inspection.
Pine Mountain Mine · 310237330 CFR 56.4201(a)(2) · $151.00 proposed penalty
Safe access.
Pine Mountain Mine · 310237330 CFR 56.11001 · Significant and substantial (S&S) · $151.00 proposed penalty
Regular Safety and Health Inspection
Pine Mountain Mine · 310237342.3 on-site hours reported
Verbal Hazard Complaint Inspections
Pine Mountain Mine · 31023730.0 on-site hours reported
Site-specific hazard awareness training.
Pine Mountain Mine · 310237330 CFR 46.11(a) · Significant and substantial (S&S) · $909.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.