Compliance Follow-up Inspection
SP-9 O'NEIL · 35024911.5 on-site hours reported
Regular Safety and Health Inspection
SP-9 O'NEIL · 35024919.0 on-site hours reported
Insulation and fittings for power wires and cables.
SP-9 O'NEIL · 350249130 CFR 56.12008 · $697.00 proposed penalty
Moving machine parts.
SP-9 O'NEIL · 350249130 CFR 56.14107(a) · $313.00 proposed penalty
Safety defects; examination, correction and records.
SP-9 O'NEIL · 350249130 CFR 56.14100(b) · $151.00 proposed penalty
Safety defects; examination, correction and records.
SP-9 O'NEIL · 350249130 CFR 56.14100(b) · $151.00 proposed penalty
Berms or guardrails.
SP-9 O'NEIL · 350249130 CFR 56.9300(b) · Significant and substantial (S&S) · $151.00 proposed penalty
Brakes.
SP-9 O'NEIL · 350249130 CFR 56.14101(a)(2) · Significant and substantial (S&S) · $504.00 proposed penalty
Regular Safety and Health Inspection
SP-9 O'NEIL · 350249115.3 on-site hours reported
Construction and maintenance of ladders.
SP-9 O'NEIL · 350249130 CFR 56.11003 · $151.00 proposed penalty
Eye protection.
SP-9 O'NEIL · 350249130 CFR 56.15004 · Significant and substantial (S&S) · $226.00 proposed penalty
Moving machine parts.
SP-9 O'NEIL · 350249130 CFR 56.14107(a) · $151.00 proposed penalty
Slip or fall of person
SP-9 O'NEIL · 3502491No dys awy frm wrk,no rstr act
Accident narrative
EE was climbing down from EE's dozer and EE's foot slipped off of the foot rail. EE fell 2-3" feet to the ground and rolled EE's ankle when EE hit the ground. EE said EE's leg was sore but didn't require immediate medical attention. The next day EE went to the doctor and they said EE strained EE's knee EE was told to ice and wrap EE's knee, but was able to return to full duty
Regular Safety and Health Inspection
SP-9 O'NEIL · 35024916.5 on-site hours reported
Examination of working places.
SP-9 O'NEIL · 350249130 CFR 56.18002(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
SP-9 O'NEIL · 350249110.3 on-site hours reported
Insulation and fittings for power wires and cables.
SP-9 O'NEIL · 350249130 CFR 56.12008 · $151.00 proposed penalty
Berms or guardrails.
SP-9 O'NEIL · 350249130 CFR 56.9300(b) · Significant and substantial (S&S) · $151.00 proposed penalty
Construction and maintenance of guards.
SP-9 O'NEIL · 350249130 CFR 56.14112(b) · Significant and substantial (S&S) · $504.00 proposed penalty
Housekeeping.
SP-9 O'NEIL · 350249130 CFR 56.20003(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Electrical conductors.
SP-9 O'NEIL · 350249130 CFR 56.12004 · $151.00 proposed penalty
Housekeeping.
SP-9 O'NEIL · 350249130 CFR 56.20003(a) · Significant and substantial (S&S) · $504.00 proposed penalty
Insulation and fittings for power wires and cables.
SP-9 O'NEIL · 350249130 CFR 56.12008 · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
SP-9 O'NEIL · 350249130 CFR 56.12008 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.