Safety defects; examination, correction and records.
Federal Underground · 110281430 CFR 57.14100(c) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Federal Underground · 110281430 CFR 57.14100(c) · $336.00 proposed penalty
Electrical conductors.
Federal Underground · 110281430 CFR 57.12004 · $151.00 proposed penalty
Construction and maintenance of guards.
Mason City Plant · 130009530 CFR 56.14112(b) · $6,540.00 proposed penalty
Construction and maintenance of guards.
Mason City Plant · 130009530 CFR 56.14112(b) · $6,540.00 proposed penalty
Construction and maintenance of guards.
Mason City Plant · 130009530 CFR 56.14112(b) · $6,540.00 proposed penalty
Testing grounding systems.
Mason City Plant · 130009530 CFR 56.12028 · $151.00 proposed penalty
Electrical conductors.
Mason City Plant · 130009530 CFR 56.12004 · $959.00 proposed penalty
Moving machine parts.
AA Limestone · 151792330 CFR 56.14107(a) · Significant and substantial (S&S) · $465.00 proposed penalty
Moving machine parts.
Downingtown Quarry · 360002930 CFR 56.14107(a) · $151.00 proposed penalty
Electrical conductors.
Downingtown Quarry · 360002930 CFR 56.12004 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Downingtown Quarry · 360002930 CFR 56.14100(b) · $151.00 proposed penalty
Inspection.
Downingtown Quarry · 360002930 CFR 56.4201(a)(1) · $151.00 proposed penalty
Parking procedures for unattended equipment.
Downingtown Quarry · 360002930 CFR 56.14207 · $151.00 proposed penalty
Electrical conductors.
Downingtown Quarry · 360002930 CFR 56.12004 · $151.00 proposed penalty
Housekeeping.
Downingtown Quarry · 360002930 CFR 56.20003(a) · $1,126.00 proposed penalty
Insulation and fittings for power wires and cables.
St. Thomas Quarry · 360940030 CFR 56.12008 · Significant and substantial (S&S) · $432.00 proposed penalty
Housekeeping.
HM Southeast Cement · 380000730 CFR 56.20003(b) · $398.00 proposed penalty
Inspection and cover plates.
HM Southeast Cement · 380000730 CFR 56.12032 · $4,383.00 proposed penalty
Electrical conductors.
HM Southeast Cement · 380000730 CFR 56.12004 · $883.00 proposed penalty
Regular Safety and Health Inspection
Mason City Plant · 1300095105.5 on-site hours reported
Combustible waste.
Federal Underground · 110281430 CFR 57.4104(b)(1) · $151.00 proposed penalty
Guarding around lights.
Mason City Plant · 130009530 CFR 56.12034 · $592.00 proposed penalty
Inspection.
Mason City Plant · 130009530 CFR 56.4201(a)(2) · $3,184.00 proposed penalty
Housekeeping.
Mason City Plant · 130009530 CFR 56.20003(b) · Significant and substantial (S&S) · $9,757.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.