Nazareth Plant I · 360019030 CFR 56.11001 · Significant and substantial (S&S) · $4,383.00 proposed penalty
Safety defects; examination, correction and records.
Nazareth Plant I · 360019030 CFR 56.14100(b) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Safe access.
Nazareth Plant I · 360019030 CFR 56.11001 · Significant and substantial (S&S) · $4,383.00 proposed penalty
Housekeeping.
Nazareth Plant I · 360019030 CFR 56.20003(a) · Significant and substantial (S&S) · $11,450.00 proposed penalty
Housekeeping.
Nazareth Plant I · 360019030 CFR 56.20003(a) · Significant and substantial (S&S) · $11,450.00 proposed penalty
Snow and ice on walkways and travelways.
Nazareth Plant I · 360019030 CFR 56.11016 · Significant and substantial (S&S) · $2,936.00 proposed penalty
Work on electrically-powered equipment.
Nazareth Plant I · 360019030 CFR 56.12016 · Significant and substantial (S&S) · $4,383.00 proposed penalty
Safe access.
Nazareth Plant I · 360019030 CFR 56.11001 · $1,968.00 proposed penalty
High-pressure hose connections.
Nazareth Plant I · 360019030 CFR 56.13021 · $398.00 proposed penalty
Work on power circuits.
Nazareth Plant I · 360019030 CFR 56.12017 · Significant and substantial (S&S) · $1,320.00 proposed penalty
Electrical conductors.
Nazareth Plant I · 360019030 CFR 56.12004 · Significant and substantial (S&S) · $1,320.00 proposed penalty
Horns and backup alarms.
Nazareth Plant I · 360019030 CFR 56.14132(b)(1)(i) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Moving machine parts.
Nazareth Plant I · 360019030 CFR 56.14107(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Use of open hooks.
Bridgeport Plant · 410002530 CFR 56.19075 · $366.00 proposed penalty
Insulation and fittings for power wires and cables.
Bridgeport Plant · 410002530 CFR 56.12008 · $366.00 proposed penalty
New task training.
Bridgeport Plant · 410002530 CFR 46.7(a) · $407.00 proposed penalty
Housekeeping.
Bridgeport Plant · 410002530 CFR 56.20003(a) · $366.00 proposed penalty
Testing grounding systems.
Bridgeport Plant · 410002530 CFR 56.12028 · $366.00 proposed penalty
Regular Safety and Health Inspection
Athens Quarry · 090003321.5 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
Fayette County Quarry · 09007218.5 on-site hours reported
Regular Safety and Health Inspection
Tyrone Mine & Mill · 15000439.3 on-site hours reported
Regular Safety and Health Inspection
Mount Vernon Underground Mine #2 · 15199797.5 on-site hours reported
Regular Safety and Health Inspection
PLUM RUN STONE · 330005422.0 on-site hours reported
Regular Safety and Health Inspection
Nazareth Plant I · 3600190225.8 on-site hours reported
Regular Safety and Health Inspection
Bridgeport Plant · 410002555.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.