Heidelberg Materials AG safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Safety defects; examination, correction and records.
EAGLE LAKE PLANT · 410169630 CFR 56.14100(b) · $151.00 proposed penalty
Housekeeping.
EAGLE LAKE PLANT · 410169630 CFR 56.20003(a) · Significant and substantial (S&S) · $313.00 proposed penalty
Hand-held power tools.
EAGLE LAKE PLANT · 410169630 CFR 56.14116(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Ardmore Stone Quarry · 120006815.8 on-site hours reported
Regular Safety and Health Inspection
Watertown Plant · 30000499.0 on-site hours reported
Regular Safety and Health Inspection
Sylvania Stone Quarry · 330016621.3 on-site hours reported
Compliance Follow-up Inspection
Bridgeport Plant · 41000250.0 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Wagner Quarries · 330017530 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Wagner Quarries · 330017530 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Wagner Quarries · 330017530 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Wagner Quarries · 330017530 CFR 50.30(a) · $151.00 proposed penalty
Written safety program.
SPRINGFIELD PIKE MINE & PLANT · 360004730 CFR 57.23002(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Hanson Aggregates Virginia · 440010130 CFR 50.30(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
POLAND PLANT · 30011864.0 on-site hours reported
Regular Safety and Health Inspection
ST JOHNSVILLE PLANT · 300128310.8 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Sandy Flat Quarry · 380031030 CFR 50.30(a) · $151.00 proposed penalty
Testing grounding systems.
Nazareth Plant I · 360019030 CFR 56.12028 · $398.00 proposed penalty
Exposure limits for airborne contaminants.
Nazareth Plant I · 360019030 CFR 56.5001(a)/56.5005 · $313.00 proposed penalty
Regular Safety and Health Inspection
JOHNSTOWN QUARRY · 30029669.3 on-site hours reported
Regular Safety and Health Inspection
Burnet Plant · 41000669.5 on-site hours reported
Safety defects; examination, correction and records.
JOHNSTOWN QUARRY · 300296630 CFR 56.14100(b) · $151.00 proposed penalty
Waste receptacles.
JOHNSTOWN QUARRY · 300296630 CFR 56.20013 · $151.00 proposed penalty
Brakes.
SPRINGFIELD PIKE MINE & PLANT · 360004730 CFR 57.14101(a)(3) · $151.00 proposed penalty
Moving machine parts.
Nazareth Plant I · 360019030 CFR 56.14107(a)
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Burnet Plant · 410006630 CFR 50.30(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.