Exposure limits for airborne contaminants.
Mason City Plant · 130009530 CFR 56.5001(a)/56.5005 · $883.00 proposed penalty
Machinery
Nazareth Plant I · 3600190No dys awy frm wrk,no rstr act
Accident narrative
Employee was using a grinder with a wire wheel when EE stood up and accidentally hit the trigger of the grinder causing it to kick back and get bound up on EE's left forearm causing a laceration.
Housekeeping.
Nazareth Plant I · 360019030 CFR 56.20003(a) · $267.00 proposed penalty
Construction and maintenance of guards.
Nazareth Plant I · 360019030 CFR 56.14112(a)(1) · $177.00 proposed penalty
Slip or fall of person
HM Southeast Cement · 3800007Days away from work only
Accident narrative
The employee was walking down the stairs at 1st bank silos when EE slipped on a piece of clinker causing EE to land EE's right foot awkwardly on the next step. On 03/05/2026 EE was issued light duty restrictions.
Regular Safety and Health Inspection
Woodburn II · 12000748.3 on-site hours reported
Regular Safety and Health Inspection
JORDANVILLE PLANT · 30000488.8 on-site hours reported
Regular Safety and Health Inspection
Nazareth 1 Quarry · 36103244.0 on-site hours reported
Blocking equipment in a raised position.
JORDANVILLE PLANT · 300004830 CFR 56.14211(a) · Significant and substantial (S&S) · $398.00 proposed penalty
Training plan implementation.
Nazareth 1 Quarry · 361032430 CFR 46.4(a)(1) · $151.00 proposed penalty
Regular Safety and Health Inspection
Arena Plant · 41014959.0 on-site hours reported
Compliance Follow-up Inspection
Sealy Plant · 41026040.5 on-site hours reported
Safety defects; examination, correction and records.
Thornton Quarry · 110006630 CFR 56.14100(b) · $151.00 proposed penalty
Safe access.
Thornton Quarry · 110006630 CFR 56.11001 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Arena Plant · 410149530 CFR 56.14100(b) · $151.00 proposed penalty
Inspection and cover plates.
Arena Plant · 410149530 CFR 56.12032 · Significant and substantial (S&S) · $2,503.00 proposed penalty
Combustible waste.
Arena Plant · 410149530 CFR 56.4104(b) · $151.00 proposed penalty
Inspection and cover plates.
Arena Plant · 410149530 CFR 56.12032 · $151.00 proposed penalty
Regular Safety and Health Inspection
Thornton Quarry · 110006625.0 on-site hours reported
Verbal Hazard Complaint Inspections
Mitchell Plant · 12000632.5 on-site hours reported
Regular Safety and Health Inspection
EAGLE LAKE PLANT · 41016964.8 on-site hours reported
Safety belts and lines.
Ardmore Stone Quarry · 120006830 CFR 56.15005 · Significant and substantial (S&S) · $226.00 proposed penalty
Identification of power switches.
SPRINGFIELD PIKE MINE & PLANT · 360004730 CFR 57.12018 · $151.00 proposed penalty
Identification of power switches.
SPRINGFIELD PIKE MINE & PLANT · 360004730 CFR 57.12018 · $151.00 proposed penalty
Inspection.
Nazareth Plant I · 360019030 CFR 56.4201(a)(2) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.