Heidelberg Materials AG safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Written safety program.
Sandusky Quarry · 330015130 CFR 56.23002(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
PRINCETON QUARRY · 310007724.0 on-site hours reported
Electrical conductors.
PRINCETON QUARRY · 310007730 CFR 56.12004 · $226.00 proposed penalty
Prohibited areas for food and beverages.
PRINCETON QUARRY · 310007730 CFR 56.20014 · $151.00 proposed penalty
Inspection.
Sandusky Quarry · 330015130 CFR 56.4201(a)(2) · $151.00 proposed penalty
Horns and backup alarms.
Sandusky Quarry · 330015130 CFR 56.14132(a) · $151.00 proposed penalty
Testing grounding systems.
Sandusky Quarry · 330015130 CFR 56.12028 · $151.00 proposed penalty
Electric substations and liquid storage facilities.
Nazareth Plant I · 360019030 CFR 56.4130(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
HARDING STREET QUARRY-SURFACE · 120115024.0 on-site hours reported
Regular Safety and Health Inspection
Sandusky Quarry · 330015153.5 on-site hours reported
Impoundment Spot Inspection
Eagle Crushed Stone · 33043625.8 on-site hours reported
Spot Inspection
Nazareth Plant I · 36001904.0 on-site hours reported
Handtools (nonpowered)
Gainesville Quarry · 0900034No dys awy frm wrk,no rstr act
Accident narrative
The employee was using a hammer to remove the ground engagement tool (tooth) on the loader bucket. When striking the GET, a chip from the hammer face broke off and entered the top of the employee's left forearm.
Compliance Follow-up Inspection
Romeo Quarry · 11000704.3 on-site hours reported
Berms or guardrails.
Romeo Quarry · 110007030 CFR 56.9300(a) · Significant and substantial (S&S) · $432.00 proposed penalty
Brakes.
Putnamville Quarry · 120207330 CFR 56.14101(a)(3) · Significant and substantial (S&S) · $755.00 proposed penalty
Impoundment Spot Inspection
Atkins Mine · 120000416.0 on-site hours reported
Regular Safety and Health Inspection
Putnamville Quarry · 120207313.5 on-site hours reported
Compliance Follow-up Inspection
Mason City Plant · 13000950.5 on-site hours reported
Retaining dams.
Atkins Mine · 120000430 CFR 56.20010 · $151.00 proposed penalty
Junction box connection procedures.
Putnamville Quarry · 120207330 CFR 56.12007 · Significant and substantial (S&S) · $5,574.00 proposed penalty
Inspection.
Putnamville Quarry · 120207330 CFR 56.4201(a)(1) · $151.00 proposed penalty
Machinery
HM Southeast Cement · 3800007Days restricted activity only
Accident narrative
The employee was changing a unplugged drill bit. EE was using EEs hands to loosen and tighten the drill bit in place. EE could not get a sufficient grip on the drill due to wearing gloves that had oil/grease on them as did the drill. EE removed EEs gloves to attempt to improve EEs grip. EEs hand slipped while tightening the drill and struck the tip of the bit causing a laceration.
103 (g) Written Notification Hazard Complaint Inspectio
EVANSVILLE PLANT · 36001856.3 on-site hours reported
Exposure limits for airborne contaminants.
Mason City Plant · 130009530 CFR 56.5001(a)/56.5005 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.