Heidelberg Materials AG safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Mitchell Plant · 120006385.3 on-site hours reported
Regular Safety and Health Inspection
Hayden Quarry · 12013929.0 on-site hours reported
Regular Safety and Health Inspection
Bloomsburg Quarry · 360595311.0 on-site hours reported
Closure of valves.
Hayden Quarry · 120139230 CFR 56.4603(b) · $151.00 proposed penalty
Construction and maintenance of guards.
MT. VERNON MINE & MILL · 150005130 CFR 57.14112(a)(1) · $151.00 proposed penalty
Handling of materials
Thornton Quarry · 1100066Days away from work only
Accident narrative
At the start of the shift employee was climbing access ladder of 992G FEL. Employee stated they felt right arm tingle and feel numb. They did not slip or try to catch themselves, was just climbing ladder normally. EE was taken to clinic, diagnosed w/ arm/shoulder strain, placed on restricted duty and referred to PT for eval and treatment
Slip or fall of person
LAKE BRIDGEPORT QUARRY · 4100081Days away from work only
Accident narrative
EE was climbing the ladder of the shipping loader to go to work. When climbing the shipping loader, EE missed the step and fell backwards. EE landed on the ground on EE's right shoulder and back then hit the upper back portion of EE's head.
Compliance Follow-up Inspection
Mason City Plant · 13000951.8 on-site hours reported
Regular Safety and Health Inspection
Tyrone Mine & Mill · 150004312.0 on-site hours reported
Regular Safety and Health Inspection
MT. VERNON MINE & MILL · 150005147.0 on-site hours reported
Compliance Follow-up Inspection
Nazareth 1 Quarry · 36103240.0 on-site hours reported
Safety defects; examination, correction and records.
MT. VERNON MINE & MILL · 150005130 CFR 57.14100(b) · $151.00 proposed penalty
Powered haulage
Mitchell Plant · 1200063Days away from work only
Accident narrative
UNDER THE SILOS IS A TIGHT SPACE. WAS USING A WALK BEHIND SKID STEER. MOBILITY WAS LIMITED, OPERATOR WAS GOING IN REVERSE WITH A LIMITED FIELD OF VIEW
Spot Inspection
Habersham Quarry · 09006931.3 on-site hours reported
Impoundment Spot Inspection
Thun Field Pit · 45011112.8 on-site hours reported
Spot Inspection
Sandusky Quarry · 33001518.8 on-site hours reported
Regular Safety and Health Inspection
SPRINGFIELD PIKE MINE & PLANT · 360004766.0 on-site hours reported
Regular Safety and Health Inspection
TORRANCE MINE (UG) · 360848450.5 on-site hours reported
Correction of hazardous conditions.
TORRANCE MINE (UG) · 360848430 CFR 57.3200 · Significant and substantial (S&S) · $2,503.00 proposed penalty
Spot Inspection
Atkins Mine · 12000044.0 on-site hours reported
Spot Inspection
Coopers Lane Mine · 12013913.5 on-site hours reported
Spot Inspection
Eagle Crushed Stone · 33043622.5 on-site hours reported
Spot Inspection
Canby Pit · 35035081.5 on-site hours reported
Correction of hazardous conditions.
Atkins Mine · 120000430 CFR 56.3200 · Significant and substantial (S&S) · $313.00 proposed penalty
Drill dust control.
Coopers Lane Mine · 120139130 CFR 58.620 · Significant and substantial (S&S) · $177.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.