Regular Safety and Health Inspection
North Bend · 45035478.3 on-site hours reported
Safe access.
North Bend · 450354730 CFR 56.11001 · $165.00 proposed penalty
Examination of working places.
North Bend · 450354730 CFR 56.18002(a) · $151.00 proposed penalty
Compliance Follow-up Inspection
Batavia · 30008121.0 on-site hours reported
Regular Safety and Health Inspection
Canby Pit · 35035088.8 on-site hours reported
Regular Safety and Health Inspection
Thunder Mountain Quarry · 45011272.5 on-site hours reported
Electrical conductors.
Canby Pit · 350350830 CFR 56.12004 · $209.00 proposed penalty
Protection of gas cylinder valves.
Thunder Mountain Quarry · 450112730 CFR 56.16006 · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Logansport Cement Plant · 12000659.0 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
Nazareth Plant I · 360019011.5 on-site hours reported
Regular Safety and Health Inspection
Blossburg Plant · 360609617.0 on-site hours reported
Regular Safety and Health Inspection
St. Thomas Quarry · 360940011.5 on-site hours reported
Regular Safety and Health Inspection
Pelham Quarry · 380056712.5 on-site hours reported
Housekeeping.
Logansport Cement Plant · 120006530 CFR 56.20003(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Housekeeping.
Logansport Cement Plant · 120006530 CFR 56.20003(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Housekeeping.
Logansport Cement Plant · 120006530 CFR 56.20003(a) · $818.00 proposed penalty
Machinery, equipment, and tools.
Logansport Cement Plant · 120006530 CFR 56.14205 · Significant and substantial (S&S) · $504.00 proposed penalty
Horns and backup alarms.
Jamesville Plant · 300006030 CFR 56.14132(a) · $1,431.00 proposed penalty
Safety defects; examination, correction and records.
Jamesville Plant · 300006030 CFR 56.14100(c) · Significant and substantial (S&S) · $959.00 proposed penalty
Moving machine parts.
Jamesville Plant · 300006030 CFR 56.14107(a) · $151.00 proposed penalty
Work on power circuits.
Nazareth Plant I · 360019030 CFR 56.12017 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Protection of persons at switchgear.
Blossburg Plant · 360609630 CFR 56.12020 · $151.00 proposed penalty
Safety defects; examination, correction and records.
St. Thomas Quarry · 360940030 CFR 56.14100(b) · $151.00 proposed penalty
Housekeeping.
Jamesville Plant · 300006030 CFR 56.20003(a) · Significant and substantial (S&S) · $642.00 proposed penalty
Construction and maintenance of guards.
Jamesville Plant · 300006030 CFR 56.14112(b) · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.