Heidelberg Materials AG safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Housekeeping.
Mason City Plant · 130009530 CFR 56.20003(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty
Inspection and cover plates.
Mason City Plant · 130009530 CFR 56.12032 · $592.00 proposed penalty
Safety defects; examination, correction and records.
Mason City Plant · 130009530 CFR 56.14100(c) · $883.00 proposed penalty
Testing grounding systems.
Mason City Plant · 130009530 CFR 56.12028 · $1,968.00 proposed penalty
Protection for openings around travelways.
Mason City Plant · 130009530 CFR 56.11012 · Significant and substantial (S&S) · $9,757.00 proposed penalty
Guarding around lights.
Mason City Plant · 130009530 CFR 56.12034 · $1,968.00 proposed penalty
Testing grounding systems.
Mason City Plant · 130009530 CFR 56.12028 · $1,968.00 proposed penalty
Construction and maintenance of ladders.
Mason City Plant · 130009530 CFR 56.11003 · $883.00 proposed penalty
Safety defects; examination, correction and records.
Mason City Plant · 130009530 CFR 56.14100(c) · $398.00 proposed penalty
Pit or quarry wall perimeter.
Mill Creek Quarry · 340219830 CFR 56.3131 · $209.00 proposed penalty
Brakes.
Mill Creek Quarry · 340219830 CFR 56.14101(a)(2) · $151.00 proposed penalty
Inspection.
Mill Creek Quarry · 340219830 CFR 56.4201(a)(2) · $151.00 proposed penalty
Handling of materials
Sealy Plant · 4102604Days restricted activity only
Accident narrative
EE and another worker were installing a cutting edge in a front loader. The cutting edge was upside down and they attempted to flip it over. They lost control of the cutting edge and it, fell on right middle finger of EE's hand.
Regular Safety and Health Inspection
Mason City Plant · 1300095218.8 on-site hours reported
Regular Safety and Health Inspection
Tyrone Mine & Mill · 150004322.0 on-site hours reported
Regular Safety and Health Inspection
Mill Creek Quarry · 340219813.0 on-site hours reported
Permissible exposure level.
HARDING STREET QUARRY-SURFACE · 120115030 CFR 62.130(a) · $151.00 proposed penalty
Safe access.
UPTON QUARRY · 150004530 CFR 56.11001 · Significant and substantial (S&S)
Construction and maintenance of guards.
UPTON QUARRY · 150004530 CFR 56.14112(a)(1) · $177.00 proposed penalty
Handrails and toeboards.
UPTON QUARRY · 150004530 CFR 56.11002 · $177.00 proposed penalty
Moving machine parts.
UPTON QUARRY · 150004530 CFR 56.14107(a) · Significant and substantial (S&S) · $883.00 proposed penalty
Construction and maintenance of guards.
UPTON QUARRY · 150004530 CFR 56.14112(b) · $177.00 proposed penalty
Housekeeping.
Sandusky Quarry · 330015130 CFR 56.20003(a)
Splices and repairs of power cables.
Sandusky Quarry · 330015130 CFR 56.12013(a)
Compliance Follow-up Inspection
UNION BRIDGE MD · 18000170.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.