Heidelberg Materials AG safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
New task training.
Nazareth Plant I · 360019030 CFR 46.7(a) · $2,936.00 proposed penalty
Inspection and cover plates.
Nazareth Plant I · 360019030 CFR 56.12032 · Significant and substantial (S&S) · $38,016.00 proposed penalty
Horns and backup alarms.
Nazareth Plant I · 360019030 CFR 56.14132(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty
Machinery, equipment, and tools.
Bridgeport Plant · 410002530 CFR 56.14205 · Significant and substantial (S&S) · $9,757.00 proposed penalty
Protective equipment and clothing for hazards and irritants.
Bridgeport Plant · 410002530 CFR 56.15006 · Significant and substantial (S&S) · $9,757.00 proposed penalty
Investigation.
Bridgeport Plant · 410002530 CFR 50.11(b) · $151.00 proposed penalty
Safety defects; examination, correction and records.
LAKE BRIDGEPORT QUARRY · 410008130 CFR 56.14100(c) · $336.00 proposed penalty
Prohibited areas for food and beverages.
LAKE BRIDGEPORT QUARRY · 410008130 CFR 56.20014 · $226.00 proposed penalty
Self-propelled equipment.
LAKE BRIDGEPORT QUARRY · 410008130 CFR 56.4230(a)(1) · $226.00 proposed penalty
Regular Safety and Health Inspection
UPTON QUARRY · 150004516.5 on-site hours reported
Regular Safety and Health Inspection
Sylvania Stone Quarry · 330016610.5 on-site hours reported
Compliance Follow-up Inspection
Downingtown Quarry · 36000294.0 on-site hours reported
Regular Safety and Health Inspection
EVANSVILLE PLANT · 360018550.8 on-site hours reported
Notification of results; reporting requirements.
Ardmore Stone Quarry · 120006830 CFR 62.175(a)(1) · $151.00 proposed penalty
Notification of results; reporting requirements.
Ardmore Stone Quarry · 120006830 CFR 62.175(b) · $151.00 proposed penalty
Safety defects; examination, correction and records.
MT. VERNON MINE & MILL · 150005130 CFR 57.14100(b) · $151.00 proposed penalty
Operators' stations.
MT. VERNON MINE & MILL · 150005130 CFR 57.14103(c)(1) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Sylvania Stone Quarry · 330016630 CFR 56.14100(b) · $151.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts.
EVANSVILLE PLANT · 360018530 CFR 56.14130(g) · Significant and substantial (S&S) · $398.00 proposed penalty
Inspection.
EVANSVILLE PLANT · 360018530 CFR 56.4201(a)(1) · $151.00 proposed penalty
Inspection.
Nazareth Plant I · 360019030 CFR 56.4201(a)(1) · $592.00 proposed penalty
High-pressure hose connections.
Nazareth Plant I · 360019030 CFR 56.13021 · $883.00 proposed penalty
Construction and maintenance of guards.
Nazareth Plant I · 360019030 CFR 56.14112(b) · $3,448.00 proposed penalty
High-pressure hose connections.
Nazareth Plant I · 360019030 CFR 56.13021 · $883.00 proposed penalty
Construction and maintenance of guards.
LAKE BRIDGEPORT QUARRY · 410008130 CFR 56.14112(a)(1) · $336.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.