Heidelberg Materials AG safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Identification of power switches.
EVANSVILLE PLANT · 360018530 CFR 56.12018 · $226.00 proposed penalty
Identification of power switches.
Nazareth Plant I · 360019030 CFR 56.12018 · $1,968.00 proposed penalty
Electrical conductors.
Nazareth Plant I · 360019030 CFR 56.12004 · $8,315.00 proposed penalty
Horns and backup alarms.
Nazareth Plant I · 360019030 CFR 56.14132(a) · $883.00 proposed penalty
Gauges and regulators.
Nazareth Plant I · 360019030 CFR 56.4602 · $883.00 proposed penalty
Housekeeping.
Nazareth Plant I · 360019030 CFR 56.20003(a) · Significant and substantial (S&S) · $13,436.00 proposed penalty
Inspection.
Nazareth Plant I · 360019030 CFR 56.4201(a)(2) · $592.00 proposed penalty
New miner training.
Nazareth Plant I · 360019030 CFR 46.5(b) · Significant and substantial (S&S) · $407.00 proposed penalty
Annual refresher training.
LAKE BRIDGEPORT QUARRY · 410008130 CFR 46.8 · $320.00 proposed penalty
Temporary, portable containers.
Lehigh Northwest Cement Company · 450216630 CFR 47.44(b) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Lehigh Northwest Cement Company · 450216630 CFR 50.30(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Lehigh Northwest Cement Company · 450216630 CFR 56.14100(b) · $177.00 proposed penalty
Handtools (nonpowered)
EVANSVILLE PLANT · 3600185Days restricted activity only
Accident narrative
The employee was poking lumps out of a discharge chute with a bar. As employee was poling the material the bar broke through the material, the employee pinched right middle finger between the bar and the edge of the chute.
Regular Safety and Health Inspection
Thornton Quarry · 110006624.3 on-site hours reported
Locking transformer enclosures.
Thornton Quarry · 110006630 CFR 56.12068 · $818.00 proposed penalty
Responsibility for independent contractor training.
UNION BRIDGE MD · 180001730 CFR 46.12(a)(2) · $697.00 proposed penalty
New miner training.
UNION BRIDGE MD · 180001730 CFR 46.5(a) · $168.00 proposed penalty
Inspection and cover plates.
UNION BRIDGE MD · 180001730 CFR 56.12032 · $151.00 proposed penalty
Housekeeping.
UNION BRIDGE MD · 180001730 CFR 56.20003(c) · $151.00 proposed penalty
General requirements.
Salona Plant · 360013730 CFR 56.4200(b)(2) · $151.00 proposed penalty
Housekeeping.
EVANSVILLE PLANT · 360018530 CFR 56.20003(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Housekeeping.
EVANSVILLE PLANT · 360018530 CFR 56.20003(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Identification of power switches.
Nazareth Plant I · 360019030 CFR 56.12018 · $1,968.00 proposed penalty
Construction and maintenance of guards.
Nazareth Plant I · 360019030 CFR 56.14112(b) · $3,448.00 proposed penalty
Housekeeping.
Nazareth Plant I · 360019030 CFR 56.20003(a) · $2,712.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.