Heidelberg Materials AG safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Guarding electrical connections and resistor grids.
Sealy Plant · 410260430 CFR 56.12023 · $151.00 proposed penalty
Slip or fall of person
Plymouth Meeting Quarry · 3600052No dys awy frm wrk,no rstr act
Accident narrative
Employee was in Pit #3 of Plymouth Meeting Quarry to take pictures. EE was walking back to EE's vehicle and stepped on a rock while crossing 6' wide mud wash. The rock gave way, and the employee fell sideways. EE struck the left side of EE's head on a rock. Left ear was lacerated requiring stitches.
Compliance Follow-up Inspection
Nazareth Plant I · 36001901.3 on-site hours reported
Regular Safety and Health Inspection
Lithonia/Pine Mountain Quarry · 090006310.5 on-site hours reported
Safety can use.
Eagle Crushed Stone · 330436230 CFR 56.4402 · $151.00 proposed penalty
General instructions for completing MSHA Form 7000-1.
Plymouth Meeting Quarry · 360005230 CFR 50.20-1 · $151.00 proposed penalty
Requirement for container labels.
FRANKLIN QUARRY & MILL · 150005330 CFR 47.41(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Eagle Crushed Stone · 330436230 CFR 56.14100(b) · $151.00 proposed penalty
Spillage and leakage.
Eagle Crushed Stone · 330436230 CFR 56.4102 · Significant and substantial (S&S) · $336.00 proposed penalty
Brakes.
Eagle Crushed Stone · 330436230 CFR 56.14101(a)(3) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Eagle Crushed Stone · 330436230 CFR 56.14100(b) · Significant and substantial (S&S) · $336.00 proposed penalty
Brakes.
Eagle Crushed Stone · 330436230 CFR 56.14101(a)(3) · $151.00 proposed penalty
Securing gas cylinders.
Eagle Crushed Stone · 330436230 CFR 56.16005 · $151.00 proposed penalty
Housekeeping.
Plymouth Meeting Quarry · 360005230 CFR 56.20003(b) · Significant and substantial (S&S) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
EVANSVILLE PLANT · 360018530 CFR 50.30(a) · $151.00 proposed penalty
Safety belts and lines.
EVANSVILLE PLANT · 360018530 CFR 56.15005 · Significant and substantial (S&S) · $226.00 proposed penalty
Inspection.
EVANSVILLE PLANT · 360018530 CFR 56.4201(a)(2) · $151.00 proposed penalty
Electrical conductors.
BREWER SAND · 380012230 CFR 56.12004 · $151.00 proposed penalty
Regular Safety and Health Inspection
Putnamville Quarry · 120207324.3 on-site hours reported
Spot Inspection
FRANKLIN QUARRY & MILL · 150005312.5 on-site hours reported
Regular Safety and Health Inspection
Eagle Crushed Stone · 330436261.5 on-site hours reported
Regular Safety and Health Inspection
Plymouth Meeting Quarry · 360005216.0 on-site hours reported
Regular Safety and Health Inspection
BREWER SAND · 380012213.0 on-site hours reported
General requirements.
Putnamville Quarry · 120207330 CFR 56.4200(a)(1) · $432.00 proposed penalty
Storage tank foundations.
Putnamville Quarry · 120207330 CFR 56.4401 · $432.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.