← Heidelberg Materials AG

Heidelberg Materials AG safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Construction and maintenance of guards.

    violationRecord 5176093
    Bridgeport Plant · 4100025

    30 CFR 56.14112(a)(1) · $432.00 proposed penalty

  2. Insulation and fittings for power wires and cables.

    violationRecord 5179070
    LAKE BRIDGEPORT QUARRY · 4100081

    30 CFR 56.12008 · $465.00 proposed penalty

  3. Moving machine parts.

    violationRecord 5179069
    LAKE BRIDGEPORT QUARRY · 4100081

    30 CFR 56.14107(a) · $209.00 proposed penalty

  4. Non-Injury Accident Investigation

    inspectionRecord F02E2E9
    Nazareth Plant I · 3600190

    7.0 on-site hours reported

  5. Testing grounding systems.

    violationRecord 9788619
    Nokomis Quarry · 1100024

    30 CFR 56.12028 · $209.00 proposed penalty

  6. Controls and switches.

    violationRecord 5079967
    Nazareth Plant I · 3600190

    30 CFR 56.12002 · $151.00 proposed penalty

  7. Immediate notification.

    violationRecord 5079966
    Nazareth Plant I · 3600190

    30 CFR 50.10(d) · $151.00 proposed penalty

  8. Protection for openings around travelways.

    violationRecord 5176092
    Bridgeport Plant · 4100025

    30 CFR 56.11012 · $1,219.00 proposed penalty

  9. Construction and maintenance of guards.

    violationRecord 5176091
    Bridgeport Plant · 4100025

    30 CFR 56.14112(a)(1) · $549.00 proposed penalty

  10. Berms or guardrails.

    violationRecord 5176090
    Bridgeport Plant · 4100025

    30 CFR 56.9300(a) · $366.00 proposed penalty

  11. Brakes.

    violationRecord 5179068
    LAKE BRIDGEPORT QUARRY · 4100081

    30 CFR 56.14101(a)(1) · $165.00 proposed penalty

  12. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5179067
    LAKE BRIDGEPORT QUARRY · 4100081

    30 CFR 50.30(a) · $151.00 proposed penalty

  13. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5179066
    LAKE BRIDGEPORT QUARRY · 4100081

    30 CFR 50.30(a) · $151.00 proposed penalty

  14. Examination of working places.

    violationRecord 5179065
    LAKE BRIDGEPORT QUARRY · 4100081

    30 CFR 56.18002 · $818.00 proposed penalty

  15. Safety defects; examination, correction and records.

    violationRecord 5179064
    LAKE BRIDGEPORT QUARRY · 4100081

    30 CFR 56.14100(a) · $165.00 proposed penalty

  16. Brakes.

    violationRecord 5175870
    LAKE BRIDGEPORT QUARRY · 4100081

    30 CFR 56.14101(a)(2) · $165.00 proposed penalty

  17. Safety defects; examination, correction and records.

    violationRecord 5175869
    LAKE BRIDGEPORT QUARRY · 4100081

    30 CFR 56.14100(b) · $165.00 proposed penalty

  18. Spot Inspection

    inspectionRecord F006BD4
    MT. VERNON MINE & MILL · 1500051

    9.5 on-site hours reported

  19. Regular Safety and Health Inspection

    inspectionRecord F03A532
    Bridgeport Plant · 4100025

    41.5 on-site hours reported

  20. Regular Safety and Health Inspection

    inspectionRecord F0451CA
    LAKE BRIDGEPORT QUARRY · 4100081

    22.5 on-site hours reported

  21. Toilet facilities.

    violationRecord 9775358
    MT. VERNON MINE & MILL · 1500051

    30 CFR 56.20008(b) · $151.00 proposed penalty

  22. Correction of hazardous conditions.

    violationRecord 5250216
    Bridgeport Plant · 4100025

    30 CFR 56.3200 · $465.00 proposed penalty

  23. Protection for openings around travelways.

    violationRecord 5176089
    Bridgeport Plant · 4100025

    30 CFR 56.11012 · $465.00 proposed penalty

  24. Inspection and cover plates.

    violationRecord 5176088
    Bridgeport Plant · 4100025

    30 CFR 56.12032 · $465.00 proposed penalty

  25. Safety can use.

    violationRecord 5179063
    LAKE BRIDGEPORT QUARRY · 4100081

    30 CFR 56.4402 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.