← Greer Industries Inc

Greer Industries Inc safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Brakes.

    violationRecord 9879962
    DBA: Greer Lime Company · 4600015

    30 CFR 57.14101(a)(3) · $165.00 proposed penalty

  2. Safety defects; examination, correction and records.

    violationRecord 9934084
    Greer Limestone · 4600016

    30 CFR 57.14100(b) · Significant and substantial (S&S) · $209.00 proposed penalty

  3. Safety defects; examination, correction and records.

    violationRecord 9934083
    Greer Limestone · 4600016

    30 CFR 57.14100(b) · $151.00 proposed penalty

  4. Regular Safety and Health Inspection

    inspectionRecord F010090
    DBA: Greer Lime Company · 4600015

    95.3 on-site hours reported

  5. Regular Safety and Health Inspection

    inspectionRecord F0133D3
    Greer Limestone · 4600016

    61.5 on-site hours reported

  6. Parking procedures for unattended equipment.

    violationRecord 9934081
    Greer Limestone · 4600016

    30 CFR 57.14207 · $151.00 proposed penalty

  7. Scaffolds and working platforms.

    violationRecord 9880714
    DBA: Greer Lime Company · 4600015

    30 CFR 57.11027 · $151.00 proposed penalty

  8. Safety defects; examination, correction and records.

    violationRecord 9880713
    DBA: Greer Lime Company · 4600015

    30 CFR 57.14100(b) · $151.00 proposed penalty

  9. First aid materials.

    violationRecord 9879927
    DBA: Greer Lime Company · 4600015

    30 CFR 57.15001 · $151.00 proposed penalty

  10. Ventilation Technical Investigation

    inspectionRecord F007EC3
    Greer Limestone · 4600016

    4.5 on-site hours reported

  11. Horns and backup alarms for surface equipment.

    violationRecord 9880712
    DBA: Greer Lime Company · 4600015

    30 CFR 57.14132(a) · $151.00 proposed penalty

  12. Ventilation Technical Investigation

    inspectionRecord F007EC2
    Decker's Creek Limestone Company · 4600029

    9.3 on-site hours reported

  13. General requirements.

    violationRecord 9879926
    DBA: Greer Lime Company · 4600015

    30 CFR 57.4200(b)(2) · $151.00 proposed penalty

  14. High-pressure hose connections.

    violationRecord 9879925
    DBA: Greer Lime Company · 4600015

    30 CFR 57.13021 · $151.00 proposed penalty

  15. Escape routes.

    violationRecord 9584870
    Decker's Creek Limestone Company · 4600029

    30 CFR 57.11051(a) · $151.00 proposed penalty

  16. Regular Safety and Health Inspection

    inspectionRecord F010089
    DBA: Greer Lime Company · 4600015

    89.0 on-site hours reported

  17. Eye protection.

    violationRecord 9583260
    Decker's Creek Limestone Company · 4600029

    30 CFR 57.15004 · $151.00 proposed penalty

  18. Protection of surplus trailing cables.

    violationRecord 9583259
    Decker's Creek Limestone Company · 4600029

    30 CFR 57.12039 · $151.00 proposed penalty

  19. Handling of materials

    accidentRecord 220251260013
    Greer Limestone · 4600016

    Days away from work only

    Accident narrative

    Employee was out of the loader manually moving the face drill cable out of their way so that they could clean up. While they were working the cable out of the way they felt a strain in their abdomen that did not ease up throughout the day. They came out and reported the incident around their quitting time.

  20. Regular Safety and Health Inspection

    inspectionRecord F00A383
    Decker's Creek Limestone Company · 4600029

    40.0 on-site hours reported

  21. General requirements.

    violationRecord 9933524
    Greer Limestone · 4600016

    30 CFR 56.4200(b)(2) · $151.00 proposed penalty

  22. Moving machine parts.

    violationRecord 9933523
    Greer Limestone · 4600016

    30 CFR 56.14107(a) · $151.00 proposed penalty

  23. Safe access.

    violationRecord 9933522
    Greer Limestone · 4600016

    30 CFR 56.11001 · $151.00 proposed penalty

  24. Handtools (nonpowered)

    accidentRecord 220251190002
    DBA: Greer Lime Company · 4600015

    Days restricted activity only

    Accident narrative

    Employee was clearing a plugged chute between 2VS1 Screen and 2BC3 belt conveyor using a bar. The plugged 3/4 inch crusher run broke free while employee was prodding the chute with the bar, causing the employee to mash EE's left thumb on the lip of the inspection door.

  25. Handling of materials

    accidentRecord 220251060017
    Decker's Creek Limestone Company · 4600029

    No dys awy frm wrk,no rstr act

    Accident narrative

    When attempting to close tailgate after dumping off, driver grasped tailgate bottom and pulled outward. As they let the tailgate fall to latch, they did not ensure fingers were clear of the pinch point. Their right, little finger was smashed. EE was diagnosed with a open fracture of the distal phalanx of the right, little finger and required 14 stitches to close the wound.

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.