Global Mining Group LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mechanical equipment guards.
Bull Mountains Mine No 1 · 240195030 CFR 75.1722(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Identification of circuit breakers and disconnecting switches.
Bull Mountains Mine No 1 · 240195030 CFR 75.809 · $755.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Bull Mountains Mine No 1 · 240195030 CFR 75.1731(a) · $226.00 proposed penalty
Installation of high-voltage transmission cables.
Bull Mountains Mine No 1 · 240195030 CFR 75.807 · $226.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Bull Mountains Mine No 1 · 240195030 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Bull Mountains Mine No 1 · 240195030 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Bull Mountains Mine No 1 · 240195030 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Bull Mountains Mine No 1 · 240195030 CFR 50.30(a) · $151.00 proposed penalty
Ventilation controls.
Bull Mountains Mine No 1 · 240195030 CFR 75.333(c)(3) · $177.00 proposed penalty
Maintenance of diesel-powered equipment.
Bull Mountains Mine No 1 · 240195030 CFR 75.1914(a) · $151.00 proposed penalty
Electric equipment; frequency of examination and testing.
Bull Mountains Mine No 1 · 240195030 CFR 77.502-2 · $226.00 proposed penalty
Identification of circuit breakers.
Bull Mountains Mine No 1 · 240195030 CFR 77.904 · $226.00 proposed penalty
Examination and maintenance of firefighting equipment.
Bull Mountains Mine No 1 · 240195030 CFR 77.1110 · $226.00 proposed penalty
Escape and evacuation; plan.
Bull Mountains Mine No 1 · 240195030 CFR 77.1101(c) · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
Bull Mountains Mine No 1 · 240195030 CFR 77.410(a)(1) · $226.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Bull Mountains Mine No 1 · 240195030 CFR 77.502 · $226.00 proposed penalty
Electric equipment; frequency of examination and testing.
Bull Mountains Mine No 1 · 240195030 CFR 77.502-2 · $151.00 proposed penalty
Fall of roof or back
Bull Mountains Mine No 1 · 2401950Perm tot or perm prtl disablty
Accident narrative
Changing bits on shearer, rotating drum with hand. Sprags were extended shields set, pan pulled back as far as possible. A small rock fell from face striking small finger between bit and rock on left hand causing fractured bone and laceration to the middle phalanx of small finger. The medical team at the hospital removed the top part of the finger. 3 days later closed injury.
Handling of materials
Bull Mountains Mine No 1 · 2401950No dys awy frm wrk,no rstr act
Accident narrative
Removing cylinder on pineal hitch on tow tractor, while removing hydraulic hoses, hitch dropped pinching left hand between cylinder and frame. Causing laceration in left palm. Requiring 7 stitches.
Loading and haulage equipment; installations.
Bull Mountains Mine No 1 · 240195030 CFR 77.1605(l) · $151.00 proposed penalty
Accumulation of combustible materials.
Bull Mountains Mine No 1 · 240195030 CFR 75.400 · $366.00 proposed penalty
Regular Safety and Health Inspection
Bull Mountains Mine No 1 · 2401950362.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.