GCC SAB de CV safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Housekeeping.
GCC Dacotah Inc · 390002230 CFR 56.20003(b) · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
King II · 050486430 CFR 77.410(c) · $151.00 proposed penalty
Brakes.
GCC Dacotah Inc · 390002230 CFR 56.14101(a)(3) · $151.00 proposed penalty
Brakes.
GCC Dacotah Inc · 390002230 CFR 56.14101(a)(3) · $151.00 proposed penalty
Regular Safety and Health Inspection
GCC Dacotah Inc · 390002271.3 on-site hours reported
Inspection and cover plates.
GCC Dacotah Inc · 390002230 CFR 56.12032 · Significant and substantial (S&S) · $11,450.00 proposed penalty
Construction and maintenance of guards.
GCC Dacotah Inc · 390002230 CFR 56.14112(b) · $288.00 proposed penalty
Machinery and equipment; operation and maintenance.
King II · 050486430 CFR 75.1725(c) · $151.00 proposed penalty
Handling of materials
Odessa Cement Plant · 4100060All other cases (incl 1st aid)
Accident narrative
Employee ascending stairs was struck by material dislodged from handrails by an employee descending. Dust entered left eye behind safety glasses. Employee rubbed eye, resulting in corneal abrasion. Treated with OTC eye drops; prescription cream provided as a preventive measure only, not for treatment.
Operation of diesel-powered equipment.
King II · 050486430 CFR 75.1916(e) · $151.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
King II · 050486430 CFR 75.1107-9(a)(1) · $151.00 proposed penalty
Construction and maintenance of guards.
McKelligon Canyon · 410004630 CFR 56.14112(a)(1) · $267.00 proposed penalty
Housekeeping.
McKelligon Canyon · 410004630 CFR 56.20003(a) · $267.00 proposed penalty
Housekeeping.
McKelligon Canyon · 410004630 CFR 56.20003(a) · $177.00 proposed penalty
Safe access.
McKelligon Canyon · 410004630 CFR 56.11001 · Significant and substantial (S&S) · $366.00 proposed penalty
Housekeeping.
McKelligon Canyon · 410004630 CFR 56.20003(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Construction and maintenance of guards.
McKelligon Canyon · 410004630 CFR 56.14112(b) · $336.00 proposed penalty
Warning signs.
McKelligon Canyon · 410004630 CFR 56.4101 · $209.00 proposed penalty
Requirement for container labels.
McKelligon Canyon · 410004630 CFR 47.41(a) · $209.00 proposed penalty
Access to stationary electrical equipment or switchgear.
McKelligon Canyon · 410004630 CFR 56.12019 · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
McKelligon Canyon · 41000460.5 on-site hours reported
Regular Safety and Health Inspection
McKelligon Canyon · 410004616.8 on-site hours reported
Parking procedures for unattended equipment.
McKelligon Canyon · 410004630 CFR 56.14207 · $151.00 proposed penalty
Protective equipment and clothing for hazards and irritants.
McKelligon Canyon · 410004630 CFR 56.15006 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Handrails and toeboards.
McKelligon Canyon · 410004630 CFR 56.11002 · $2,503.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.