GCC SAB de CV safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
King II · 050486430 CFR 75.400 · $336.00 proposed penalty
Self-propelled equipment.
Henderson Pit · 410533230 CFR 56.4230(a)(1) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Henderson Pit · 410533230 CFR 56.14100(d) · $193.00 proposed penalty
Safety defects; examination, correction and records.
Henderson Pit · 410533230 CFR 56.14100(b) · $432.00 proposed penalty
Safety defects; examination, correction and records.
Henderson Pit · 410533230 CFR 56.14100(b) · $432.00 proposed penalty
Horns and backup alarms.
Henderson Pit · 410533230 CFR 56.14132(b)(1) · $193.00 proposed penalty
Inspection.
Henderson Pit · 410533230 CFR 56.4201(a)(1) · $193.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Henderson Pit · 410533230 CFR 50.30(a) · $151.00 proposed penalty
First aid.
Henderson Pit · 410533230 CFR 56.18010 · $193.00 proposed penalty
Requirement for a HazCom program.
Henderson Pit · 410533230 CFR 47.31(b) · $193.00 proposed penalty
Regular Safety and Health Inspection
Henderson Pit · 41053328.5 on-site hours reported
Inspection of fire suppression devices.
King II · 050486430 CFR 75.1107-16(b) · Significant and substantial (S&S) · $959.00 proposed penalty
Machinery and equipment; operation and maintenance.
King II · 050486430 CFR 75.1725(a) · $193.00 proposed penalty
Permissible electric face equipment; maintenance.
King II · 050486430 CFR 75.503 · $288.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
King II · 050486430 CFR 75.1731(b) · $193.00 proposed penalty
Entrapment
Tijeras Plant & Quarry · 2900013Accident only
Accident narrative
Mill Manlift gearbox broke. Miner was entrapped in manlift for 38 minutes. Miner egressed out emergency exit of manlift roof.
Respirable dust standards.
King II · 050486430 CFR 70.100(a)(2) · $288.00 proposed penalty
Respirable dust standards.
King II · 050486430 CFR 70.100(a)(2) · $288.00 proposed penalty
Powered haulage
GCC Dacotah Inc · 3900022Fatality
Accident narrative
A miner received fatal injuries. After a bridge collapsed that the miner was operating a skid steer loader on. The miner was clearing refractory brick form a rotary kiln. The bridge that was installed by the property owner collapsed. The skid steer fell approximately 10 feet into a hopper, causing the payload of brick to engulf the operator causing fatal wounds.
Fatal Accident Investigation
GCC Dacotah Inc · 390002271.3 on-site hours reported
Violation — cited standard not reported
GCC Dacotah Inc · 3900022Electrical conductors.
Odessa Cement Plant · 410006030 CFR 56.12004 · $151.00 proposed penalty
Identification of power switches.
Odessa Cement Plant · 410006030 CFR 56.12018 · $592.00 proposed penalty
Accumulation of combustible materials.
King II · 050486430 CFR 75.400 · $151.00 proposed penalty
Preshift examination at fixed intervals.
King II · 050486430 CFR 75.360(f) · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.