← GCC SAB de CV

GCC SAB de CV safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Training plans.

    violationRecord 5051344
    GCC Dacotah Inc · 3900022

    30 CFR 46.3(b)(4) · $313.00 proposed penalty

  2. New task training.

    violationRecord 5051343
    GCC Dacotah Inc · 3900022

    30 CFR 46.7(a) · Significant and substantial (S&S) · $3,832.00 proposed penalty

  3. Inspection.

    violationRecord 5051342
    GCC Dacotah Inc · 3900022

    30 CFR 56.4201(a)(2) · $209.00 proposed penalty

  4. Storage of hazardous materials.

    violationRecord 5051341
    GCC Dacotah Inc · 3900022

    30 CFR 56.16003 · $209.00 proposed penalty

  5. Compliance Follow-up Inspection

    inspectionRecord F01716D
    Tijeras Plant & Quarry · 2900013

    1.0 on-site hours reported

  6. High-pressure hose connections.

    violationRecord 5051340
    GCC Dacotah Inc · 3900022

    30 CFR 56.13021 · $549.00 proposed penalty

  7. Insulation and fittings for power wires and cables.

    violationRecord 5051339
    GCC Dacotah Inc · 3900022

    30 CFR 56.12008 · $549.00 proposed penalty

  8. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 9734816
    King II · 0504864

    30 CFR 75.1911(a)(4) · $151.00 proposed penalty

  9. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 9734815
    King II · 0504864

    30 CFR 75.1910(j) · $151.00 proposed penalty

  10. Testing grounding systems.

    violationRecord 5054306
    GCC Dacotah Inc · 3900022

    30 CFR 56.12028 · $151.00 proposed penalty

  11. Records of training.

    violationRecord 5054305
    GCC Dacotah Inc · 3900022

    30 CFR 46.9(a) · $151.00 proposed penalty

  12. Moving machine parts.

    violationRecord 5051338
    GCC Dacotah Inc · 3900022

    30 CFR 56.14107(a) · $642.00 proposed penalty

  13. Inspection.

    violationRecord 9799492
    McKelligon Canyon · 4100046

    30 CFR 56.4201(a)(2) · $165.00 proposed penalty

  14. Regular Safety and Health Inspection

    inspectionRecord F014A91
    McKelligon Canyon · 4100046

    12.8 on-site hours reported

  15. Mine ventilation plan; submission and approval.

    violationRecord 9734814
    King II · 0504864

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  16. Safe access.

    violationRecord 9829897
    GCC Dacotah Inc · 3900022

    30 CFR 56.11001 · $549.00 proposed penalty

  17. Warning signs.

    violationRecord 9829896
    GCC Dacotah Inc · 3900022

    30 CFR 56.4101 · $193.00 proposed penalty

  18. Testing grounding systems.

    violationRecord 9829895
    GCC Dacotah Inc · 3900022

    30 CFR 56.12028 · $288.00 proposed penalty

  19. Spillage and leakage.

    violationRecord 5054135
    GCC Dacotah Inc · 3900022

    30 CFR 56.4102 · $288.00 proposed penalty

  20. Spillage and leakage.

    violationRecord 5054134
    GCC Dacotah Inc · 3900022

    30 CFR 56.4102 · $288.00 proposed penalty

  21. Housekeeping.

    violationRecord 5050688
    GCC Dacotah Inc · 3900022

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  22. Inspection and cover plates.

    violationRecord 5050687
    GCC Dacotah Inc · 3900022

    30 CFR 56.12032 · $1,679.00 proposed penalty

  23. Housekeeping.

    violationRecord 5050686
    GCC Dacotah Inc · 3900022

    30 CFR 56.20003(a) · $288.00 proposed penalty

  24. Construction and maintenance of guards.

    violationRecord 5050685
    GCC Dacotah Inc · 3900022

    30 CFR 56.14112(a)(1) · $151.00 proposed penalty

  25. Handrails and toeboards.

    violationRecord 5050684
    GCC Dacotah Inc · 3900022

    30 CFR 56.11002 · $959.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.