GCC SAB de CV safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Toro Aggregates · 29022959.0 on-site hours reported
Regular Safety and Health Inspection
Martin 137 · 41052499.5 on-site hours reported
Regular Safety and Health Inspection
Borger S&G · 41055477.0 on-site hours reported
Accumulation of combustible materials.
King II · 050486430 CFR 75.400 · $245.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Toro Aggregates · 290229530 CFR 50.30(a) · $151.00 proposed penalty
Testing grounding systems.
Toro Aggregates · 290229530 CFR 56.12028 · $267.00 proposed penalty
Changes; notification by operator.
Toro Aggregates · 290229530 CFR 41.12 · $151.00 proposed penalty
Moving machine parts.
Toro Aggregates · 290229530 CFR 56.14107(a) · $151.00 proposed penalty
Changes; notification by operator.
Martin 137 · 410524930 CFR 41.12 · $151.00 proposed penalty
Written safety program.
Martin 137 · 410524930 CFR 56.23002(a) · $151.00 proposed penalty
Construction and maintenance of guards.
Martin 137 · 410524930 CFR 56.14112(a)(1) · Significant and substantial (S&S) · $288.00 proposed penalty
Berms or guardrails.
Martin 137 · 410524930 CFR 56.9300(b) · Significant and substantial (S&S) · $288.00 proposed penalty
Safety defects; examination, correction and records.
Martin 137 · 410524930 CFR 56.14100(b) · $151.00 proposed penalty
Safe access.
Martin 137 · 410524930 CFR 56.11001 · $151.00 proposed penalty
Moving machine parts.
Vado Quarry · 290212830 CFR 56.14107(a) · $549.00 proposed penalty
Parking procedures for unattended equipment.
Vado Quarry · 290212830 CFR 56.14207 · $1,219.00 proposed penalty
Regular Safety and Health Inspection
Vado Quarry · 29021287.5 on-site hours reported
Automatic fire warning devices; actions and response.
King II · 050486430 CFR 75.1103-5(h)(1) · $504.00 proposed penalty
Automatic fire sensors.
King II · 050486430 CFR 75.1103-1 · Significant and substantial (S&S) · $2,503.00 proposed penalty
Accumulation of combustible materials.
King II · 050486430 CFR 75.400 · $245.00 proposed penalty
Underground storage, lubricating oil and grease.
King II · 050486430 CFR 75.1104 · $151.00 proposed penalty
Accumulation of combustible materials.
King II · 050486430 CFR 75.400 · $245.00 proposed penalty
Escapeways; bituminous and lignite mines.
King II · 050486430 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty
Illumination of surface working areas.
Pueblo Plant & Quarry · 050482230 CFR 56.17001 · $151.00 proposed penalty
Examination of working places.
Pueblo Plant & Quarry · 050482230 CFR 56.18002(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.