Handtools (nonpowered)
GCC Dacotah Inc · 3900022Days restricted activity only
Accident narrative
Miner was replacing rear belt skirting. After removing the old skirting, the miner used it to trace and cut a new piece. As the affected miner was starting to cut the new piece, the knife slipped and embedded itself about an inch into their leg. The miner was taken to urgent care, where they received four stitches just above the knee.
Regular Safety and Health Inspection
McKelligon Canyon · 410004616.8 on-site hours reported
Ventilation controls.
King II · 050486430 CFR 75.333(h) · $151.00 proposed penalty
Accumulation of combustible materials.
King II · 050486430 CFR 75.400 · $288.00 proposed penalty
Inspection.
Trident Plant & Quarry · 240001430 CFR 56.4201(a)(1) · $151.00 proposed penalty
Inspection.
Trident Plant & Quarry · 240001430 CFR 56.4201(a)(1) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Trident Plant & Quarry · 240001430 CFR 56.12008 · $151.00 proposed penalty
Construction and maintenance of guards.
Trident Plant & Quarry · 240001430 CFR 56.14112(a)(1) · $226.00 proposed penalty
Machinery, equipment, and tools.
Trident Plant & Quarry · 240001430 CFR 56.14205 · $151.00 proposed penalty
Construction and maintenance of guards.
Trident Plant & Quarry · 240001430 CFR 56.14112(b) · $226.00 proposed penalty
Air receiver tanks.
Trident Plant & Quarry · 240001430 CFR 56.13011 · $151.00 proposed penalty
Combustible waste.
Tijeras Plant & Quarry · 290001330 CFR 56.4104(a) · $193.00 proposed penalty
Air receiver tanks.
Tijeras Plant & Quarry · 290001330 CFR 56.13011 · $193.00 proposed penalty
Site-specific hazard awareness training.
Tijeras Plant & Quarry · 290001330 CFR 46.11(b)(3) · $215.00 proposed penalty
General requirements.
Tijeras Plant & Quarry · 290001330 CFR 56.4200(b)(2) · $193.00 proposed penalty
Annual refresher training.
McKelligon Canyon · 410004630 CFR 46.8(a)(2) · $184.00 proposed penalty
Requirement for container labels.
McKelligon Canyon · 410004630 CFR 47.41(a) · $151.00 proposed penalty
Wall, bank, and slope stability.
McKelligon Canyon · 410004630 CFR 56.3130 · Significant and substantial (S&S) · $959.00 proposed penalty
Correction of hazardous conditions.
McKelligon Canyon · 410004630 CFR 56.3200 · Significant and substantial (S&S) · $959.00 proposed penalty
Requirement for container labels.
McKelligon Canyon · 410004630 CFR 47.41(a) · $193.00 proposed penalty
Inspection and cover plates.
McKelligon Canyon · 410004630 CFR 56.12032 · $432.00 proposed penalty
Moving machine parts.
McKelligon Canyon · 410004630 CFR 56.14107(a) · $193.00 proposed penalty
Parking procedures for unattended equipment.
McKelligon Canyon · 410004630 CFR 56.14207 · $151.00 proposed penalty
Regular Safety and Health Inspection
Trident Plant & Quarry · 240001441.8 on-site hours reported
Mine ventilation plan; submission and approval.
King II · 050486430 CFR 75.370(a)(1) · $267.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.