GCC SAB de CV safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Requirement for container labels.
Pueblo Plant & Quarry · 050482230 CFR 47.41(a) · $209.00 proposed penalty
Housekeeping.
Pueblo Plant & Quarry · 050482230 CFR 56.20003(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Safe access.
Pueblo Plant & Quarry · 050482230 CFR 56.11001 · Significant and substantial (S&S) · $1,037.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
King II · 050486430 CFR 75.1731(b) · $151.00 proposed penalty
Handling of materials
GCC Dacotah Inc · 3900022No dys awy frm wrk,no rstr act
Accident narrative
The employee was moving thin sheets of metal (not wearing the appropriate PPE, cut-proof gloves) and cut EE's finger, resulting in five stitches.
Maintenance of belt conveyors and belt conveyor entries.
King II · 050486430 CFR 75.1731(a) · $267.00 proposed penalty
Handling of materials
GCC Dacotah Inc · 3900022Days away from work only
Accident narrative
The employee was bent down picking up extra bolts when they felt a pop in their knee as they stood up. It was determined that the employee tore their meniscus and needed surgery.
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
King II · 050486430 CFR 75.1714-3(d) · $151.00 proposed penalty
Examination of working places.
McKelligon Canyon · 410004630 CFR 56.18002(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Berms or guardrails.
McKelligon Canyon · 410004630 CFR 56.9300(b) · Significant and substantial (S&S) · $818.00 proposed penalty
Housekeeping.
McKelligon Canyon · 410004630 CFR 56.20003(a) · $151.00 proposed penalty
Protection of trailing cables.
King II · 050486430 CFR 75.606 · $151.00 proposed penalty
Controls and switches.
Trident Plant & Quarry · 240001430 CFR 56.12002 · $432.00 proposed penalty
Controls and switches.
Trident Plant & Quarry · 240001430 CFR 56.12002 · $151.00 proposed penalty
Safe access.
Trident Plant & Quarry · 240001430 CFR 56.11001 · $151.00 proposed penalty
Electrical conductors.
Trident Plant & Quarry · 240001430 CFR 56.12004 · $151.00 proposed penalty
Electrical conductors.
Tijeras Plant & Quarry · 290001330 CFR 56.12004 · $165.00 proposed penalty
Moving machine parts.
McKelligon Canyon · 410004630 CFR 56.14107(a) · $193.00 proposed penalty
Housekeeping.
McKelligon Canyon · 410004630 CFR 56.20003(a) · $151.00 proposed penalty
Parking procedures for unattended equipment.
McKelligon Canyon · 410004630 CFR 56.14207 · $245.00 proposed penalty
Safety defects; examination, correction and records.
McKelligon Canyon · 410004630 CFR 56.14100(d) · $151.00 proposed penalty
Safety defects; examination, correction and records.
McKelligon Canyon · 410004630 CFR 56.14100(b) · $151.00 proposed penalty
Berms or guardrails.
McKelligon Canyon · 410004630 CFR 56.9300(a) · $432.00 proposed penalty
Safety defects; examination, correction and records.
McKelligon Canyon · 410004630 CFR 56.14100(b) · $151.00 proposed penalty
Designation of person in charge.
McKelligon Canyon · 410004630 CFR 56.18009 · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.