Clear Creek Quarry · 400361030 CFR 56.14100(b) · $193.00 proposed penalty
General requirements.
Clear Creek Quarry · 400361030 CFR 56.4200(b)(2) · $193.00 proposed penalty
Safety defects; examination, correction and records.
Clear Creek Quarry · 400361030 CFR 56.14100(b) · Significant and substantial (S&S) · $3,184.00 proposed penalty
General requirements.
Clear Creek Quarry · 400361030 CFR 56.4200(b)(2) · $193.00 proposed penalty
Safety defects; examination, correction and records.
Clear Creek Quarry · 400361030 CFR 56.14100(b) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts.
Clear Creek Quarry · 400361030 CFR 56.14130(g) · Significant and substantial (S&S) · $10,569.00 proposed penalty
Moving machine parts.
Hommel Concrete Co. Quarry · 400335230 CFR 56.14107 · $288.00 proposed penalty
Inspection and cover plates.
Hommel Concrete Co. Quarry · 400335230 CFR 56.12032 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Moving machine parts.
Hommel Concrete Co. Quarry · 400335230 CFR 56.14107 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Regular Safety and Health Inspection
Hommel Concrete Co. Quarry · 40033529.8 on-site hours reported
Testing grounding systems.
Clear Creek Quarry · 400361030 CFR 56.12028 · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Clear Creek Quarry · 400361030 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Clear Creek Quarry · 400361030 CFR 50.30(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Clear Creek Quarry · 400361013.0 on-site hours reported
First-aid materials.
Clear Creek Quarry · 400361030 CFR 56.15001 · Significant and substantial (S&S) · $193.00 proposed penalty
Brakes.
Clear Creek Quarry · 400361030 CFR 56.14101(a)(3) · Significant and substantial (S&S) · $193.00 proposed penalty
Safety defects; examination, correction and records.
Clear Creek Quarry · 400361030 CFR 56.14100(b) · $151.00 proposed penalty
Horns and backup alarms.
Clear Creek Quarry · 400361030 CFR 56.14132(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Safe access.
Clear Creek Quarry · 400361030 CFR 56.11001 · Significant and substantial (S&S) · $151.00 proposed penalty
Berms or guardrails.
Clear Creek Quarry · 400361030 CFR 56.9300(a) · Significant and substantial (S&S) · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.