Freeport-McMoRan Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Identification of power switches.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.12018 · $245.00 proposed penalty
Construction and maintenance of guards.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14112(b) · $366.00 proposed penalty
Inspection and cover plates.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.12032 · Significant and substantial (S&S)
Housekeeping.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.20003(a) · Significant and substantial (S&S)
Construction and maintenance of guards.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14112(a)(1) · Significant and substantial (S&S)
Insulation and fittings for power wires and cables.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.12008
Inspection and cover plates.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.12032 · Significant and substantial (S&S) · $13,436.00 proposed penalty
Construction and maintenance of guards.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14112(b) · $366.00 proposed penalty
Insulation and fittings for power wires and cables.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.12008
Inspection.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.4201(a)(1)
Housekeeping.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.20003(a) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Housekeeping.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.20003(a) · $366.00 proposed penalty
Housekeeping.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.20003(a) · $366.00 proposed penalty
Safety defects; examination, correction and records.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14100(c) · $209.00 proposed penalty
First-aid materials.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.15001 · $5,144.00 proposed penalty
Combustible waste.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.4104(b) · $245.00 proposed penalty
Requirement for container labels.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 47.41(a)(1) · $245.00 proposed penalty
Machinery, equipment, and tools.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14205 · $818.00 proposed penalty
Requirement for container labels.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 47.41(a)(1) · $245.00 proposed penalty
Correction of dangerous conditions.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.12030 · $818.00 proposed penalty
Correction of dangerous conditions.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.12030 · $245.00 proposed penalty
Housekeeping.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.20003(a) · $366.00 proposed penalty
Guarding electrical connections and resistor grids.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.12023 · $245.00 proposed penalty
Electrical conductors.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.12004 · $366.00 proposed penalty
Safety defects; examination, correction and records.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14100(a) · $549.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.