Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14100(c) · $151.00 proposed penalty
Identification of power switches.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.12018 · $818.00 proposed penalty
Storage facilities.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.4430(a)(2) · $288.00 proposed penalty
Housekeeping.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.20003(a) · $288.00 proposed penalty
Requirement for container labels.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 47.41(a)(1) · $193.00 proposed penalty
Machinery, equipment, and tools.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14205 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Machinery, equipment, and tools.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14205 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Requirement for container labels.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 47.41(a)(1) · $193.00 proposed penalty
Safety defects; examination, correction and records.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14100(c) · $1,126.00 proposed penalty
Spillage and leakage.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.4102 · $193.00 proposed penalty
Inspection.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.4201(a)(5) · $642.00 proposed penalty
Testing grounding systems.
HENDERSON OPERATIONS · 050079030 CFR 57.12028 · $398.00 proposed penalty
Electrical conductors.
HENDERSON OPERATIONS · 050079030 CFR 57.12004 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Safety defects; examination, correction and records.
Chino Mines Co Mine · 290070830 CFR 56.14100(c) · Significant and substantial (S&S) · $4,383.00 proposed penalty
General requirements.
Chino Mines Co Mine · 290070830 CFR 56.4200(b)(2) · $398.00 proposed penalty
Correction of dangerous conditions.
Chino Mines Co Mine · 290070830 CFR 56.12030 · $883.00 proposed penalty
Insulation and fittings for power wires and cables.
Chino Mines Co Mine · 290070830 CFR 56.12008 · $267.00 proposed penalty
Compressor air intakes.
Chino Mines Co Mine · 290070830 CFR 56.13012 · $267.00 proposed penalty
Handrails and toeboards.
Chino Mines Co Mine · 290070830 CFR 56.11002 · $267.00 proposed penalty
Inspection.
Chino Mines Co Mine · 290070830 CFR 56.4201(a)(1) · $267.00 proposed penalty
Identification of power switches.
Chino Mines Co Mine · 290070830 CFR 56.12018 · $267.00 proposed penalty
Regular Safety and Health Inspection
Chino Mines Co Mine · 290070894.3 on-site hours reported
Testing grounding systems.
HENDERSON OPERATIONS · 050079030 CFR 57.12028 · $398.00 proposed penalty
Violation — cited standard not reported
HENDERSON OPERATIONS · 0500790$168.00 proposed penalty
Machinery
Freeport-McMoRan Morenci Inc. · 0200024Days restricted activity only
Accident narrative
The employee was working at the CLP Plant jack hammering concrete, when the jack hammer bounced up and landed on the employee's left foot. The jack hammer tip struck the boot between the steel toe and the Metatarsal cover. Causing a fracture to the left big toe.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.