Spillage and leakage.
Freeport-McMoRan Bagdad Inc · 020013730 CFR 56.4102 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Freeport-McMoRan Bagdad Inc · 020013730 CFR 56.14100(c) · $151.00 proposed penalty
Protection of gas cylinder valves.
Freeport-McMoRan Bagdad Inc · 020013730 CFR 56.16006 · $151.00 proposed penalty
Protection of gas cylinder valves.
Freeport-McMoRan Bagdad Inc · 020013730 CFR 56.16006 · $151.00 proposed penalty
Berms or guardrails.
HENDERSON OPERATIONS · 050079030 CFR 57.9300(d)(1) · $592.00 proposed penalty
Testing grounding systems.
HENDERSON OPERATIONS · 050079030 CFR 57.12028 · $3,448.00 proposed penalty
Brakes.
HENDERSON OPERATIONS · 050079030 CFR 57.14101(a)(3) · $151.00 proposed penalty
Warning signs.
HENDERSON OPERATIONS · 050079030 CFR 57.4101 · $177.00 proposed penalty
Danger signs.
HENDERSON OPERATIONS · 050079030 CFR 57.12021 · $592.00 proposed penalty
Surface electric substations and liquid storage facilities.
HENDERSON OPERATIONS · 050079030 CFR 57.4130(a)(1) · $177.00 proposed penalty
Handling of materials
TYRONE MINE · 2900159Days away from work only
Accident narrative
Employees were pulling a vertical turbine pump, had placed a joint of column pipe on lay down timbers. As the pipe reached the last timber, it was slightly higher, so employee attempted to lift the pipe and exacerbated a recently repaired hernia. Surgical repair slated for 05/21/26. Currently ONGOING.
Compliance Follow-up Inspection
Freeport-McMoRan Safford Inc · 02031312.5 on-site hours reported
Safety defects; examination, correction and records.
Freeport-McMoRan Bagdad Inc · 020013730 CFR 56.14100(c) · $151.00 proposed penalty
Housekeeping.
HENDERSON OPERATIONS · 050079030 CFR 57.20003(a) · $336.00 proposed penalty
Housekeeping.
HENDERSON OPERATIONS · 050079030 CFR 57.20003(a) · $336.00 proposed penalty
Construction and maintenance of guards.
HENDERSON OPERATIONS · 050079030 CFR 57.14112(a)(1) · $267.00 proposed penalty
Requirement for container labels.
HENDERSON OPERATIONS · 050079030 CFR 47.41(a)(1) · $151.00 proposed penalty
First aid materials.
HENDERSON OPERATIONS · 050079030 CFR 57.15001 · $151.00 proposed penalty
Identification of power switches.
HENDERSON OPERATIONS · 050079030 CFR 57.12018 · $245.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
Freeport-McMoRan Sierrita Ops. · 02001445.0 on-site hours reported
Regular Safety and Health Inspection
HENDERSON OPERATIONS · 0500790219.0 on-site hours reported
Insulation and fittings for power wires and cables.
Freeport-McMoRan Bagdad Inc · 020013730 CFR 56.12008
Access to stationary electrical equipment or switchgear.
HENDERSON OPERATIONS · 050079030 CFR 57.12019 · $592.00 proposed penalty
Ventilation and shielding for welding.
HENDERSON OPERATIONS · 050079030 CFR 57.14213(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Correction of dangerous conditions.
HENDERSON OPERATIONS · 050079030 CFR 57.12030 · Significant and substantial (S&S)
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.