Frank John Lasky safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Annual refresher training.
MINE 1 · 060085230 CFR 46.8(a) · $168.00 proposed penalty
Regular Safety and Health Inspection
MINE 1 · 060085213.3 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
MINE 1 · 060085230 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
MINE 1 · 060085230 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
MINE 1 · 060085230 CFR 50.30(a) · $151.00 proposed penalty
Inspection.
MINE 1 · 060085230 CFR 56.4201(a)(2) · $151.00 proposed penalty
Safe access.
MINE 1 · 060085230 CFR 56.11001 · $151.00 proposed penalty
Compliance Follow-up Inspection
MINE 1 · 06008525.0 on-site hours reported
Regular Safety and Health Inspection
MINE 1 · 06008527.8 on-site hours reported
Verbal Hazard Complaint Inspections
MINE 1 · 06008521.3 on-site hours reported
Notification by operator.
MINE 1 · 060085230 CFR 41.11(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
MINE 1 · 060085230 CFR 56.14100(b) · $151.00 proposed penalty
Written safety program.
MINE 1 · 060085230 CFR 56.23002(a) · $151.00 proposed penalty
Toilet facilities.
MINE 1 · 060085230 CFR 56.20008(a) · $151.00 proposed penalty
Training plans.
MINE 1 · 060085230 CFR 46.3(a) · $151.00 proposed penalty
First aid.
MINE 1 · 060085230 CFR 56.18010 · $151.00 proposed penalty
Requirement for a HazCom program.
MINE 1 · 060085230 CFR 47.31(a) · $151.00 proposed penalty
First-aid materials.
MINE 1 · 060085230 CFR 56.15001 · $151.00 proposed penalty
Conveyor start-up warnings.
MINE 1 · 060085230 CFR 56.14201(b) · $151.00 proposed penalty
Berms or guardrails.
MINE 1 · 060085230 CFR 56.9300(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Barricades and warning signs.
MINE 1 · 060085230 CFR 56.20011 · $151.00 proposed penalty
Spillage and leakage.
MINE 1 · 060085230 CFR 56.4102 · $151.00 proposed penalty
Safety defects; examination, correction and records.
MINE 1 · 060085230 CFR 56.14100(b) · $151.00 proposed penalty
Safe access.
MINE 1 · 060085230 CFR 56.11001 · Significant and substantial (S&S) · $151.00 proposed penalty
New miner training.
MINE 1 · 060085230 CFR 46.5(a) · $168.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.