← Foresight Energy Labor LLC

Foresight Energy Labor LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Inspection of fire suppression devices.

    violationRecord 5016443
    MC#1 Mine · 1103189

    30 CFR 75.1107-16-b · $245.00 proposed penalty

  2. Weekly examination.

    violationRecord 5011271
    MC#1 Mine · 1103189

    30 CFR 75.364(b) · $151.00 proposed penalty

  3. Spot Inspections

    inspectionRecord F00C539
    Mach #1 Mine · 1103141

    103(i) · 6.5 on-site hours reported

  4. Spot Inspections

    inspectionRecord F00C1C0
    MC#1 Mine · 1103189

    103(i) · 6.0 on-site hours reported

  5. Methane monitors.

    violationRecord 5016442
    MC#1 Mine · 1103189

    30 CFR 75.342(a)(4) · $165.00 proposed penalty

  6. Travelways at surface installations.

    violationRecord 5012478
    MC#1 Mine · 1103189

    30 CFR 77.205(e) · $245.00 proposed penalty

  7. Travelways at surface installations.

    violationRecord 5012477
    MC#1 Mine · 1103189

    30 CFR 77.205(b) · $245.00 proposed penalty

  8. Accumulations of combustible materials.

    violationRecord 5012476
    MC#1 Mine · 1103189

    30 CFR 77.1104 · $245.00 proposed penalty

  9. Maintenance of incombustible content of rock dust.

    violationRecord 5017117
    MC#1 Mine · 1103189

    30 CFR 75.403 · $366.00 proposed penalty

  10. Machinery

    accidentRecord 220262430063
    Mach #1 Mine · 1103141

    Days away from work only

    Accident narrative

    I.E. cribbed up the stageloader crusher and began cutting out a dog bone. Before the cut was complete, the crusher shifted, causing the I.E. to move out of the way. During the movement the I.E. struck their knee against the crusher motor resulting in a contusion.

  11. Spot Inspections

    inspectionRecord F00C538
    Mach #1 Mine · 1103141

    103(i) · 7.0 on-site hours reported

  12. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5016441
    MC#1 Mine · 1103189

    30 CFR 75.1731(b) · $151.00 proposed penalty

  13. Mine ventilation plan; submission and approval.

    violationRecord 5011270
    MC#1 Mine · 1103189

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5017116
    MC#1 Mine · 1103189

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $7,084.00 proposed penalty

  15. Ventilation controls.

    violationRecord 5017115
    MC#1 Mine · 1103189

    30 CFR 75.333(h) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  16. Spot Inspections

    inspectionRecord F0352AE
    Deer Run Mine · 1103182

    103(i) · 6.8 on-site hours reported

  17. Spot Inspections

    inspectionRecord F016B0C
    MC#1 Mine · 1103189

    103(i) · 6.0 on-site hours reported

  18. Methane monitors.

    violationRecord 5015132
    Deer Run Mine · 1103182

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  19. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 5016440
    MC#1 Mine · 1103189

    30 CFR 75.701 · $245.00 proposed penalty

  20. Permissible electric face equipment; maintenance.

    violationRecord 5016439
    MC#1 Mine · 1103189

    30 CFR 75.503 · $313.00 proposed penalty

  21. Handling of materials

    accidentRecord 220262430031
    Deer Run Mine · 1103182

    No dys awy frm wrk,no rstr act

    Accident narrative

    IE was adjusting straps on the ventilation tubes when the tubes fell and hit EE's hand causing a laceration. IE received 3 sutures.

  22. Low- and medium-voltage circuits serving three-phase alternating current equipment; circuit breakers.

    violationRecord 5017213
    MC#1 Mine · 1103189

    30 CFR 75.900 · Significant and substantial (S&S) · $4,047.00 proposed penalty

  23. Ventilation controls.

    violationRecord 5017212
    MC#1 Mine · 1103189

    30 CFR 75.333(h) · $288.00 proposed penalty

  24. Handling of materials

    accidentRecord 220262320013
    Mach #1 Mine · 1103141

    Days away from work only

    Accident narrative

    I.E. was helping take down water pipe and was hit by the pipe when they dropped it to the ground.

  25. Handling of materials

    accidentRecord 220262320012
    Mach #1 Mine · 1103141

    No dys awy frm wrk,no rstr act

    Accident narrative

    While handling a replacement cutting edge for a D11 dozer, the I.E. pinched their right little finger between the replacement cutting edge and another cutting edge already on the ground.

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.