Foresight Energy Labor LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Power wires and cables; insulation and protection.
MC#1 Mine · 110318930 CFR 75.517 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Mine ventilation plan; submission and approval.
MC#1 Mine · 110318930 CFR 75.370(a)(1) · $366.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 6.0 on-site hours reported
Multi-gas detectors.
Mach #1 Mine · 110314130 CFR 75.1714-7(a) · $209.00 proposed penalty
Installation of electric equipment and conductors; permissibility.
Mach #1 Mine · 110314130 CFR 75.1002(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Permissible electric face equipment; maintenance.
MC#1 Mine · 110318930 CFR 75.503 · Significant and substantial (S&S) · $1,126.00 proposed penalty
Machinery and equipment; operation and maintenance.
MC#1 Mine · 110318930 CFR 75.1725(a) · $151.00 proposed penalty
Electrical connections or splices; suitability.
MC#1 Mine · 110318930 CFR 75.514 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Handtools (nonpowered)
Mach #1 Mine · 1103141Days away from work only
Accident narrative
I.E. was helping rebuild cmi dryer and was using a chain fall to remove the lid. EE experienced some pain in EE's lower back but finished EE's shift. EE strained EE's back. EE did not become a lost time until 2/24/2025.
Protection of trailing cables.
Mach #1 Mine · 110314130 CFR 75.606 · $3,184.00 proposed penalty
Methane monitors.
Mach #1 Mine · 110314130 CFR 75.342(a)(4) · $151.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $366.00 proposed penalty
Spot Inspections
Mach #1 Mine · 1103141103(i) · 6.0 on-site hours reported
Maintenance of incombustible content of rock dust.
MC#1 Mine · 110318930 CFR 75.403 · $193.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 5.0 on-site hours reported
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $313.00 proposed penalty
Performing work from a raised position; safeguards.
MC#1 Mine · 110318930 CFR 75.1726(a) · $151.00 proposed penalty
Conventional roof support.
MC#1 Mine · 110318930 CFR 75.206(e) · $193.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $313.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MC#1 Mine · 110318930 CFR 75.1731(a) · $193.00 proposed penalty
Spot Inspections
Deer Run Mine · 1103182103(i) · 8.0 on-site hours reported
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Escapeways; bituminous and lignite mines.
Mach #1 Mine · 110314130 CFR 75.380(d)(7)(i) · Significant and substantial (S&S) · $9,757.00 proposed penalty
Power wires and cables; insulation and protection.
Deer Run Mine · 110318230 CFR 75.517 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
MC#1 Mine · 110318930 CFR 75.1107-9(a)(2) · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.