Foresight Energy Labor LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspections
Mach #1 Mine · 1103141103(i) · 7.0 on-site hours reported
Spot Inspections
MC#1 Mine · 1103189103(i) · 6.5 on-site hours reported
Methane monitors.
Mach #1 Mine · 110314130 CFR 75.342(a)(4) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Other safeguards.
Mach #1 Mine · 110314130 CFR 75.1403 · Significant and substantial (S&S) · $4,383.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Mach #1 Mine · 110314130 CFR 77.502 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Deer Run Mine · 110318230 CFR 75.1731(c) · $193.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Deer Run Mine · 110318230 CFR 75.1731(c) · $193.00 proposed penalty
Maintenance of incombustible content of rock dust.
Deer Run Mine · 110318230 CFR 75.403 · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
Deer Run Mine · 110318230 CFR 75.403 · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
Deer Run Mine · 110318230 CFR 75.403 · $151.00 proposed penalty
Electric face equipment; deenergization.
MC#1 Mine · 110318930 CFR 75.523 · $151.00 proposed penalty
Spot Inspections
Deer Run Mine · 1103182103(i) · 7.5 on-site hours reported
Escapeways; bituminous and lignite mines.
Mach #1 Mine · 110314130 CFR 75.380(i)(1) · $3,184.00 proposed penalty
Permissible exposure level.
Deer Run Mine · 110318230 CFR 62.130(a) · $288.00 proposed penalty
Accumulation of combustible materials.
Deer Run Mine · 110318230 CFR 75.400 · $288.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
Mach #1 Mine · 110314130 CFR 75.1910(b) · Significant and substantial (S&S) · $959.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $336.00 proposed penalty
Handling of materials
Mach #1 Mine · 1103141Days away from work only
Accident narrative
I.E. was trying to push a rock clear of a chute in the prep plant when EE suddenly felt pain in EE's lower back
Nonpermissible diesel-powered equipment; design and performance requirements.
MC#1 Mine · 110318930 CFR 75.1909(b)(2) · $193.00 proposed penalty
Spot Inspections
Mach #1 Mine · 1103141103(i) · 6.0 on-site hours reported
Permissible electric face equipment; maintenance.
Mach #1 Mine · 110314130 CFR 75.503 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Proximity detection systems.
Mach #1 Mine · 110314130 CFR 75.1732(b)(6) · $193.00 proposed penalty
Compressed air; general; compressed air systems.
Deer Run Mine · 110318230 CFR 75.1730(d) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Training of miners assigned to a task in which they have had no previous experience; minimum courses of instruction.
Deer Run Mine · 110318230 CFR 48.7(c) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MC#1 Mine · 110318930 CFR 75.1731(a) · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.