Foresight Energy Labor LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $465.00 proposed penalty
Identification of circuit breakers.
MC#1 Mine · 110318930 CFR 75.904 · $193.00 proposed penalty
Slip or fall of person
MC#1 Mine · 1103189Days away from work only
Accident narrative
IE was stepping down from a feed box to screen and lost EE's balance and fell on EE's right elbow. The doctor put EE in a sling and ordered EE off work
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $465.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Mach #1 Mine · 110314130 CFR 75.1909(b)(4) · $245.00 proposed penalty
Machinery
Deer Run Mine · 1103182Days away from work only
Accident narrative
IE went to connect the bottom drill steel with the top steel when the top drill steel fell from the top and smashed their little finger between the steels.
Spot Inspections
Mach #1 Mine · 1103141103(i) · 11.0 on-site hours reported
Underground diesel fuel storage—general requirements.
MC#1 Mine · 110318930 CFR 75.1902(d)(2) · $151.00 proposed penalty
On-shift examination.
MC#1 Mine · 110318930 CFR 75.362(b) · $642.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $1,037.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MC#1 Mine · 110318930 CFR 75.1731(a) · $209.00 proposed penalty
Spot Inspections
Deer Run Mine · 1103182103(i) · 7.0 on-site hours reported
Spot Inspections
MC#1 Mine · 1103189103(i) · 8.3 on-site hours reported
Electric equipment; examination, testing and maintenance.
Mach #1 Mine · 110314130 CFR 75.512 · $177.00 proposed penalty
Preshift examination at fixed intervals.
MC#1 Mine · 110318930 CFR 75.360(b) · $1,126.00 proposed penalty
Mine ventilation plan; submission and approval.
MC#1 Mine · 110318930 CFR 75.370(a)(1) · $432.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $336.00 proposed penalty
Mine ventilation plan; submission and approval.
MC#1 Mine · 110318930 CFR 75.370(a)(1) · $1,431.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $549.00 proposed penalty
Handling of materials
Mach #1 Mine · 1103141Days away from work only
Accident narrative
I.E. was spraying sealant on a stopping when it soaked through their clothing and burnt their knees.
Power wires and cables; insulation and protection.
Mach #1 Mine · 110314130 CFR 75.517 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Power wires and cables; insulation and protection.
Mach #1 Mine · 110314130 CFR 75.517 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Spot Inspections
Mach #1 Mine · 1103141103(i) · 7.3 on-site hours reported
Fire suppression systems for diesel-powered equipment and fuel transportation units.
Mach #1 Mine · 110314130 CFR 75.1911(i) · $245.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
MC#1 Mine · 110318930 CFR 75.1106-3(a)(2) · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.