Mine ventilation plan; submission and approval.
MC#1 Mine · 110318930 CFR 75.370(a)(1) · $151.00 proposed penalty
Spot Inspections
Mach #1 Mine · 1103141103(i) · 6.5 on-site hours reported
Spot Inspections
Deer Run Mine · 1103182103(i) · 5.5 on-site hours reported
Rock dusting.
Deer Run Mine · 110318230 CFR 75.402 · $193.00 proposed penalty
Protection from falls of roof, face and ribs.
MC#1 Mine · 110318930 CFR 75.202(a) · $226.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MC#1 Mine · 110318930 CFR 75.1731(a) · $209.00 proposed penalty
Inspection of fire suppression devices.
MC#1 Mine · 110318930 CFR 75.1107-16(b) · $193.00 proposed penalty
Spot Inspections
Mach #1 Mine · 1103141103(i) · 6.0 on-site hours reported
Spot Inspections
MC#1 Mine · 1103189103(i) · 6.0 on-site hours reported
Mine ventilation plan; submission and approval.
MC#1 Mine · 110318930 CFR 75.370(a)(1) · $267.00 proposed penalty
Powered haulage
Mach #1 Mine · 1103141Days away from work only
Accident narrative
I.E. was waiting on a shuttle car to go by when a miner cable that was hanging above them was knocked down and hit them in the shoulder. I.E. continued to work until they were taken off for surgery on 10-15-2025.
Mechanical escape facilities.
Mach #1 Mine · 110314130 CFR 75.382(a) · $245.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
Mach #1 Mine · 110314130 CFR 75.601-1 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Mach #1 Mine · 110314130 CFR 75.1731(b) · $313.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $313.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
MC#1 Mine · 110318930 CFR 75.1910(j) · $193.00 proposed penalty
Spot Inspections
Mach #1 Mine · 1103141103(i) · 6.5 on-site hours reported
Methane monitors.
Mach #1 Mine · 110314130 CFR 75.342(a)(4) · $165.00 proposed penalty
Mechanical equipment guards.
Deer Run Mine · 110318230 CFR 75.1722(a) · $288.00 proposed penalty
Machinery and equipment; operation and maintenance.
MC#1 Mine · 110318930 CFR 75.1725(a) · Significant and substantial (S&S) · $12,723.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
MC#1 Mine · 110318930 CFR 75.1106-3(a)(1) · Significant and substantial (S&S) · $959.00 proposed penalty
Mine ventilation plan; submission and approval.
MC#1 Mine · 110318930 CFR 75.370(a)(1) · $1,968.00 proposed penalty
Fall of roof or back
MC#1 Mine · 1103189Accident only
Accident narrative
An unintentional roof fall occurred in the HG 13 intake air course entry 2, crosscut 7, in the weekly examiners route. Exact time in unknown due to last exam was done on 7/29/2025. Fall was discovered at 9:30 am on 7/31/2025.
Non-Injury Accident Investigation
MC#1 Mine · 11031895.3 on-site hours reported
Spot Inspections
MC#1 Mine · 1103189103(i) · 2.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.