Foresight Energy Labor LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Violation — cited standard not reported
MC#1 Mine · 1103189$168.00 proposed penalty
Handling of materials
Mach #1 Mine · 1103141Days away from work only
Accident narrative
I.E. was stepping down off of the bolter when EE felt a sharp pain in EE's lower back.
Spot Inspections
Mach #1 Mine · 1103141103(i) · 6.0 on-site hours reported
Verbal Hazard Complaint Inspections
Mach #1 Mine · 11031412.5 on-site hours reported
Loading and haulage equipment; operation.
Mach #1 Mine · 110314130 CFR 77.1607(i) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
Deer Run Mine · 110318230 CFR 75.503 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Deer Run Mine · 110318230 CFR 75.370(a)(1) · $642.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $313.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 7.3 on-site hours reported
Ventilation controls.
MC#1 Mine · 110318930 CFR 75.333(h) · $226.00 proposed penalty
Spot Inspections
MC#1 Mine · 1103189103(i) · 5.5 on-site hours reported
Multi-gas detectors.
MC#1 Mine · 110318930 CFR 75.1714-7(a) · $642.00 proposed penalty
Maintenance and tests of liquefied and nonliquefied compressed gas cylinders; accessories and equipment; requirements.
MC#1 Mine · 110318930 CFR 75.1106-5(a) · $193.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
Deer Run Mine · 110318230 CFR 75.701 · $288.00 proposed penalty
Power wires and cables; insulation and protection.
Deer Run Mine · 110318230 CFR 75.517 · $3,184.00 proposed penalty
Machinery
Deer Run Mine · 1103182Days away from work only
Accident narrative
IE was trying to get the mesh off the tip of the shield when the shield tip came down and hit IE in the back causing a fracture.
Accumulation of combustible materials.
Deer Run Mine · 110318230 CFR 75.400 · $313.00 proposed penalty
Fire suppression systems for diesel-powered equipment and fuel transportation units.
Deer Run Mine · 110318230 CFR 75.1911(i) · $193.00 proposed penalty
Spot Inspections
Mach #1 Mine · 1103141103(i) · 5.5 on-site hours reported
Spot Inspections
MC#1 Mine · 1103189103(i) · 7.0 on-site hours reported
Methane monitors.
Mach #1 Mine · 110314130 CFR 75.342(a)(4) · $165.00 proposed penalty
Roof control plan.
Deer Run Mine · 110318230 CFR 75.220(a)(1) · $226.00 proposed penalty
Accumulation of combustible materials.
Deer Run Mine · 110318230 CFR 75.400 · $313.00 proposed penalty
Explosives; magazines.
MC#1 Mine · 110318930 CFR 77.1301(c)(11) · $642.00 proposed penalty
Examinations.
MC#1 Mine · 110318930 CFR 75.1433(a) · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.