Foresight Energy Labor LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspections
MC#1 Mine · 1103189103(i) · 6.0 on-site hours reported
Machinery and equipment; operation and maintenance.
Mach #1 Mine · 110314130 CFR 75.1725(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
Mach #1 Mine · 110314130 CFR 75.1600-2(e) · $245.00 proposed penalty
Inspection of fire suppression devices.
Mach #1 Mine · 110314130 CFR 75.1107-16(b) · $245.00 proposed penalty
Slip or fall of person
Mach #1 Mine · 1103141Days away from work only
Accident narrative
I.E. was walking behind the longwall to repair an electric pump when EE slipped and fell.
Spot Inspections
MC#1 Mine · 1103189103(i) · 6.5 on-site hours reported
Spot Inspections
Mach #1 Mine · 1103141103(i) · 7.5 on-site hours reported
Spot Inspections
Deer Run Mine · 1103182103(i) · 4.0 on-site hours reported
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
Mach #1 Mine · 110314130 CFR 75.1910(j) · $245.00 proposed penalty
Quantity and location of firefighting equipment.
MC#1 Mine · 110318930 CFR 75.1100-2(e) · $193.00 proposed penalty
Striking or bumping
Mach #1 Mine · 1103141Days away from work only
Accident narrative
I.E. had finished putting up a bolt. When they stepped off of the platform they struck an elbow on the boom. I.E. continued to work until taken off by their doctor on 10-23-2025.
Maintenance of diesel-powered equipment.
Mach #1 Mine · 110314130 CFR 75.1914(a) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mach #1 Mine · 110314130 CFR 75.512 · Significant and substantial (S&S) · $5,574.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Mach #1 Mine · 110314130 CFR 75.1909(b)(4) · $366.00 proposed penalty
Inspection of fire suppression devices.
Mach #1 Mine · 110314130 CFR 75.1107-16(b) · $366.00 proposed penalty
Ventilation controls.
MC#1 Mine · 110318930 CFR 75.333(h) · $1,037.00 proposed penalty
Mine ventilation plan; submission and approval.
MC#1 Mine · 110318930 CFR 75.370(a)(1) · $288.00 proposed penalty
Methane monitors.
MC#1 Mine · 110318930 CFR 75.342(a)(4) · $151.00 proposed penalty
Handling of materials
MC#1 Mine · 1103189Days away from work only
Accident narrative
I.E. stated they were pulling on a 6-foot bolt that was being installed into the roof when they felt a pop in right arm. Employee went to E.R. with a full release. Employee went to ortho. doctor and was taken off work (light duty) on 11/5/2025.
Spot Inspections
MC#1 Mine · 1103189103(i) · 7.0 on-site hours reported
Inspection of fire suppression devices.
Mach #1 Mine · 110314130 CFR 75.1107-16(b) · Significant and substantial (S&S) · $4,047.00 proposed penalty
On-shift examination.
Mach #1 Mine · 110314130 CFR 75.362(g)(2)(i) · $151.00 proposed penalty
Methane monitors.
MC#1 Mine · 110318930 CFR 75.342(a)(4) · $151.00 proposed penalty
Slip or fall of person
Mach #1 Mine · 1103141Days away from work only
Accident narrative
I.E. was shoveling out the taildrive to remove water when a sudden rush of water and gob hit EE in EE's right knee knocking EE down and twisted EE's knee.
Handling of materials
MC#1 Mine · 1103189No dys awy frm wrk,no rstr act
Accident narrative
I.E. stated EE was picking up a bottom roller when another employee dropped another roller down smashing EE's hand between the two. Employee received 18 stitches on EE's right hand.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.